1 PURPOSE<br />

1.1 On <strong>the</strong> 15 th August 2011, <strong>the</strong> New Zealand Transport Agency (NZTA) in<br />

conjunction with <strong>Porirua</strong> <strong>City</strong> <strong>Council</strong> (PCC) and Transpower New Zealand<br />

Limited (Transpower) gave Notice's <strong>of</strong> Requirement and made associated<br />

applications for resource consent with <strong>the</strong> <strong>Environmental</strong> Protection Agency<br />

(EPA) for a proposal generally referred to as <strong>the</strong> 'Transmission Gully Project'.<br />

1.2 In accordance with Section 149G(3) <strong>of</strong> <strong>the</strong> Resource Management Act 1991<br />

(<strong>the</strong> Act), <strong>the</strong> <strong>Environmental</strong> Protection Authority has commissioned <strong>the</strong><br />

<strong>Porirua</strong> <strong>City</strong> <strong>Council</strong> to prepare a report on <strong>the</strong> key issues <strong>of</strong> <strong>the</strong> Transmission<br />

Gully Project (hereon referred to as TGP). The purpose <strong>of</strong> this report is to<br />

contextualise TGP within <strong>Porirua</strong> <strong>City</strong>'s planning framework and instruments<br />

and to identify any key issues.<br />

1.3 Various Notices <strong>of</strong> Requirement (NoR) have been given/issued as part <strong>of</strong> TGP<br />

reflecting <strong>the</strong> two requiring Authorities and <strong>the</strong> cross-boundary nature <strong>of</strong> <strong>the</strong>m.<br />

Applications for resource consent have also been made due to activities<br />

associated with <strong>the</strong> construction <strong>of</strong> <strong>the</strong> proposed roads not being permitted by<br />

<strong>the</strong> various plans that fall within <strong>the</strong> jurisdiction <strong>of</strong> <strong>the</strong> Greater Wellington<br />

Regional <strong>Council</strong>. Resource consent has also been applied for <strong>the</strong> relocation <strong>of</strong><br />

<strong>the</strong> existing transmission lines. This report is limited to those matters pertaining<br />

to NoR3 (Transmission Gully Main Alignment - TGM), NoR5 (Kenepuru Link<br />

Road), NoR7 (Whitby Link Road), NoR8 (Waitangarua Link Road) and that<br />

part <strong>of</strong> <strong>the</strong> transmission line being relocated within <strong>the</strong> <strong>Porirua</strong> <strong>City</strong> boundaries.<br />

1.4 Section 149G(3) <strong>of</strong> <strong>the</strong> Act requires <strong>the</strong> following:<br />

(3) The EPA must also commission <strong>the</strong> local authority to prepare a report on<br />

<strong>the</strong> key issues in relation to <strong>the</strong> matter that includes—<br />

(a) any relevant provisions <strong>of</strong> a national policy statement, a New Zealand<br />

coastal policy statement, a regional policy statement or proposed<br />

regional policy statement, and a plan or proposed plan; and<br />

(b) a statement on whe<strong>the</strong>r all required resource consents in relation to <strong>the</strong><br />

proposal to which <strong>the</strong> matter relates have been applied for; and<br />

(c) if applicable, <strong>the</strong> activity status <strong>of</strong> all proposed activities in relation to<br />

<strong>the</strong> matter.<br />

2 SCOPE<br />

2.1 This report identifies <strong>the</strong> key issues in relation to TGP that includes those items<br />

listed in S149G(3) (see para 1.4). As well <strong>the</strong> inclusion <strong>of</strong> those listed items <strong>the</strong><br />

EPA has requested that <strong>the</strong> <strong>Council</strong> should provide <strong>the</strong> following:<br />

"(d) confirmation <strong>of</strong> <strong>the</strong> status, and weighting if proposed, <strong>of</strong> any relevant<br />

regional policy statement, and or relevant plan; and<br />

(e) Detail <strong>of</strong> <strong>the</strong> permitted baseline and existing environment for <strong>the</strong> resource<br />

consents applied for within your jurisdiction. This will include:<br />

• The permitted base line, and details <strong>of</strong> any relevant consents held in <strong>the</strong><br />

area that form <strong>the</strong> existing environment within your authority’s<br />

jurisdiction.<br />