02.08.2019 Views

NMRA RH October 2018

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNUAL REPORT <strong>2018</strong><br />

- DIVISION 12b – IRELAND<br />

Lots of activities provide interest and<br />

enjoyment at our regular monthly<br />

meetings at each other’s homes.<br />

Progress in developing our Layouts<br />

can be seen though some faster<br />

than others! Newest Member Mike<br />

Maguire (SP&S) has progressed<br />

well, his layout reflecting the tracks,<br />

jointly owned by the NP and GN. He<br />

hopes it will reflect the NW area of the<br />

US. Baseboards and most track now<br />

complete with areas of scenery progressing.<br />

Peter McVicar (UP/SP) also<br />

has track well progressed on his large<br />

permanent layout while still being our<br />

only member exhibiting a separate<br />

modular switching layout. This is scenically<br />

very full, with lots of figures and<br />

details in an industrial park. He has<br />

ideas to use it as a “peninsular” for<br />

the permanent layout. Derek Manson<br />

(BN) is still developing his rebuild. We<br />

have had a visit to Laurence Bindley’s<br />

layout at his new home. Now housed<br />

in a roomy garden shed, it has most<br />

Visit to Jeff Young’s D&RGW C&S<br />

HOn3 layout<br />

track in position with buildings saved<br />

from his previous layout carefully<br />

situated. Scenic progress at Victorville<br />

CA (ATSF/UP/SP) has stalled as I<br />

develop tracks on my S-scale layout<br />

loosely based on Phoenix AZ 1950,<br />

Jeff Young’s C&S/D&RGW progressing<br />

an H0n3 system building scenery<br />

as the track is developed. Raymond<br />

Hall (NYC) continues to build S-scale<br />

kits, helping me particularly with my<br />

HO buildings. Our other members,<br />

Norman Adamson and David Chambers<br />

continue to support our efforts<br />

and we all look forward to more enjoyment<br />

and modelling next year.<br />

Des Browne<br />

Layout Registry<br />

Jonathan Small is currently updating<br />

the Region’s list of members’ layouts<br />

available for exhibitions and displays.<br />

It was last updated in 2012-13. He<br />

will be contacting all those members<br />

currently on the list, to check that their<br />

information is correct and up to date.<br />

He invites all members with portable<br />

exhibition layouts built in the last few<br />

years, who would like to be added to<br />

the list, to get in touch with him at -<br />

jonathan.small57@gmail.com<br />

Important Achievement Program<br />

Information for the <strong>2018</strong> <strong>NMRA</strong>BR<br />

Convention<br />

Due to work commitments, I’m not<br />

sure if I’m going to be available at<br />

Derby this year. If you intend to bring<br />

models for assessment, please send<br />

me your completed SOQ’s ASAP so<br />

that I can try and organise people to<br />

be available to assess your models.<br />

I will accept partially-completed<br />

forms immediately IF you have only<br />

just started the model but will have it<br />

completed by the convention.<br />

If you do not send me your SOQs<br />

in advance (as specified in the AP<br />

Rules) and inform me ahead of the<br />

convention, I cannot guarantee<br />

that there will be qualified assessors<br />

available to assess your work.<br />

Please read all the relevant parts on<br />

the website here: https://www.nmra.<br />

org/education/achievement-program<br />

to ensure you provide what is<br />

required to avoid disappointment.<br />

There are tips and tricks there too.<br />

You can find all the forms you need<br />

here: https://www.nmra.org/forms.<br />

DO NOT use the Contest Forms.<br />

Please remember that AP assessing<br />

is not like the contest – you are<br />

expected to be there to show the<br />

assessor around your model and<br />

answer questions. However, it is not<br />

a ‘show and tell’, you still need to<br />

provide all the supporting documentation<br />

and photos showing construction<br />

and conformity (how it conforms<br />

to prototype). I would also request<br />

you to scan and email me all of your<br />

completed forms and documentation,<br />

as I have to send this on to the USA<br />

(I’m also assessed that I’m doing my<br />

job properly and fairly!)<br />

If you have any questions – call me<br />

(between 17:00 – 19:30 preferred,<br />

phone number in the Directory).<br />

One final important reminder – The<br />

AP Chairman (Keith Webb) does not<br />

run the Contests. We do not currently<br />

have a Contest Chairman, so no<br />

contest unless advised otherwise by<br />

the BoD.<br />

Keith Webb<br />

American Model Railroading in HO<br />

Locomotives<br />

Paints & Adhesives<br />

Scenics<br />

Worldwide Shipping<br />

Books<br />

Vehicles<br />

Freight Cars<br />

Passenger Cars<br />

9 Miles from Heathrow Airport<br />

DCC Systems<br />

Website Only Shows In Stock Items and Clearly Marked Advance Reservations<br />

Everything You Need To Go Model Railroading<br />

High Quality Pre-Owned Models<br />

Buildings<br />

Couplers/Trucks/Wheels<br />

Thousands Of Items In Stock<br />

Magazines<br />

Detail Parts<br />

Our Yeovil Road shop is open Tuesday to Saturday 10.00am to 4.00pm. (Closed Bank Holidays), Shop open 5 days a week - Website 24/7<br />

916 Yeovil Road, Slough Trading Estate, Berkshire, SL1 4JG<br />

www.modeljunction.info<br />

<strong>October</strong> <strong>2018</strong> - ROUNDHOUSE 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!