18.12.2012 Views

Advanced Spring Rater - Roehrig Engineering

Advanced Spring Rater - Roehrig Engineering

Advanced Spring Rater - Roehrig Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Safety Considerations for<br />

Maintenance Procedures<br />

Disclaimer of Responsibility:<br />

It is the responsibility of the personnel carrying out the maintenance procedures to ensure that sufficient<br />

measures are taken to ensure that UNDER NO CIRCUMSTANCES can the test system move if any<br />

maintenance work is being carried out.<br />

Any site safety officers should also be on hand to check that measures are taken to prevent the movement<br />

of the test system while maintenance is being carried out.<br />

<strong>Roehrig</strong> <strong>Engineering</strong>, Inc. cannot be held responsible for any injury or death to personnel or for any<br />

damage to equipment or to the building structure cause by the actuator falling while being removed from<br />

the test system.<br />

48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!