18.03.2020 Views

Drive_DriveView9_Manual_EN_200219

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project

view, enter the number of graphs (1-8), and click the Change button to see the monitoring

graphs, depending on the set number. By default, all channels are allocated as graph 1. If

you do not select separate view of channels, only 1 graph is shown again and all channels

are shown in that one graph.

2 Monitor Screen Settings

[Chat Dialog Description]

a. Color

You can change the color of channels by channel.

b. Channel Location

You can select the channel location for each channel

c. Line Width

Select the line width of the channel.

d. Minimum value

You can change the minimum value of the Y axis by channel.

e. Maximum value

You can change the maximum value of the Y axis by channel

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!