5 Gate and Platform Installation <strong>ILK</strong> PLUS INSTALLATION MANUAL<br />
6. Tighten left and right lock nut at tilt piston to keep<br />
Round side of tilt cylinder clevis MUST face down towards ground<br />
If you have not finished the welding, carefully run lift to see if it is properly aligned with the floor sill,<br />
remove pump & motor from tube and finish all welding work before continuing with detail work.<br />
Never power the lift hard against anything if you have not finished welding.<br />
For Warning lights and foot control cable if platform is equipped<br />
1. Connect cables verifying that connectors are deep seated.<br />
2. The Connectors from platform and gate are marked from the factory for easy identification<br />
- Green connector #17 – warning lights;<br />
- #14 with cable tie – up button<br />
- #8 without marks – down button<br />
Tie off cable and connectors into platform so that large portion of cable is clamped in cover and all<br />