PARTNER ARTICLE<br />

Are you ready?<br />

CHRISTER IDHAMMAR<br />

Reliability and<br />

Maintenance<br />

Management Guru,<br />

Founder IDCON INC<br />

“We need to implement<br />

Maintenance 4.0! I just<br />

came back from a conference<br />

and it seems like<br />

everybody is doing it,”<br />

exclaimed John, a<br />

reliability engineer.<br />

“JOHN, I LIKE YOUR ENTHUSIASM AND<br />

I AM GLAD YOU LEARNED SOME NEW<br />

STUFF AT THE CONFERENCE. We have<br />

higher priorities for you to work on.<br />

We had three major break downs this<br />

month that caused eight hours of lost<br />

production and expensive repairs. The<br />

daily schedule compliance is only at<br />

58 percent, and most of the jobs in the<br />

schedule aren’t planned” said Brian, the<br />

maintenance manager.<br />

“Yes” John replied, “But if we implement<br />

more machine learning and online<br />

sensors, we can increase data collection<br />

and fix this”.<br />

“John, do you remember when we<br />

put in about 100 sensors on process line<br />

two? Your cell phone was jammed up<br />

with alarms. And even though you spent<br />

a lot of time filtering them and requesting<br />

only the most urgent repairs, our<br />

backlog went way up. Your requests had<br />

to compete with all other urgent work in<br />

backlog. Several of the failures you had<br />

reported went to break down. It took<br />

us almost a year to get backlog back to<br />

what we considered normal. The same<br />

will happen, on a larger scale if we jump<br />

into more technology that we are not<br />

ready for.”<br />

“John, in the long run I agree that we<br />

should implement new technologies.<br />

I want you to keep learning about all<br />

the new technologies we can use and<br />

implement at the right time. Right now,<br />

you have to help me get the very basics<br />

implemented.”<br />

“So, what do you want me to focus on<br />

before we can implement Maintenance<br />

4.0?” asked John.<br />

“To start with the planners are only<br />

using 30 percent of their time actually<br />

planning work. The Bill of Materials is<br />

incomplete, so they can’t find the parts<br />

42 maintworld 2/<strong>2020</strong>