The coil coating process offers a variety of benefits over unit coating. It is carried out as a continuous process,<br />
enabling production to run without interruption. This results, for example, in lower material input for cleaning,<br />
pretreatment and paint application – which not only saves costs, but is also good for the environment.<br />
The non-stop, uniform coil coating process also delivers visually perfect surfaces of consistently high quality.<br />
The classic coil coating process<br />
Entry accumulator<br />
Topcoat<br />
(1) Degreasing,<br />
rinsing, pretreatment<br />
Primer<br />
Pretreatment<br />
Zinc<br />
Metal<br />
(2) Primer application<br />
(3) Topcoat application<br />
(4) Curing oven<br />
Curing oven<br />
Greater efficiency<br />
for The high-end classic coil quality coating process<br />
The Irrespective waterborne of whether <strong>BASF</strong> pretreatment it is being used primer for steel also or offers<br />
new, aluminium, more efficient the coil coating application process options is essentially for 2-coat the lines.<br />
Since same. the The optimised continuously pretreatment moving metal unit for band the (line pretreatment<br />
primer speed 30–180 enables m/min) pretreatment is cleaned and and priming pretreated to be carried (1),<br />
out coated in a (2 single and 3), stage, cured the in line an capacity oven (4), freed cooled up with in this the way<br />
can aid of be air used or water directly (5) for and another recoiled coat (7). – without the coil<br />
(6) Lamination<br />
(5) Cooling<br />
Cooling<br />
Exit accumulator<br />
accumulator<br />
being The preparatory coated having steps to (1) be consist passed of through cleaning, the degreas- line twice<br />
as ing previously. and chemically pretreating the metal. Various<br />
These coats are options, applied which in succession, substantially depending reduce the on production the later<br />
costs use of for the high-end coated sheet: products, on the include, front these for instance, are the primer<br />
the (2) and application topcoat of (3), a and clear on that the provides reverse a the backcoat, product which with<br />
additional can be applied surface at the properties. same time as the primer or topcoat.<br />
After each coating step the paint film is cured in the oven<br />
(4). Dwell time in the oven is 15-45 seconds. This twosided<br />
coating offers the optimum corrosion protection.<br />
A protective film (6) can also be applied, if required, at the<br />
end of the coating process.<br />
(7) Recoiler