2<br />

Managing Integrity<br />

Topic 4 – Planning and Resourcing<br />

• Good asset integrity requires a clear vision of<br />

the objectives that will maintain or improve the<br />

integrity performance. These goals need to be<br />

translated into clear plans at various levels and the<br />

plans must be supported by systems that provide<br />

the required resources. This approach forms the<br />

basis of <strong>BG</strong> <strong>Group</strong> aims to operate all Assets under<br />

a process of Integrated Activity Planning and<br />

Scheduling (IAPS).<br />

• Integrated planning has to be done at multiple<br />

levels but must be consistent with the overall asset<br />

goals that have been set. Resources, which may<br />

consist of people, budgets, logistics, materials etc,<br />

are a crucial link in the integrity chain and if not<br />

available at the correct time and place will cause<br />

delays in risk reduction activities.<br />

<strong>HSSE</strong> <strong>Management</strong> <strong>Tours</strong>:<br />

Asset Integrity Guide<br />

• Within planning and resourcing, the key areas are:<br />

– Having sound documented plans in place at all<br />

levels and for various timescales, from long-term<br />

strategic goals through to daily executable work<br />

– <strong>Management</strong> of the planning process to ensure<br />

fulfilment and adjustment of the plans based<br />

upon actual performance<br />

– Provision of adequate resourcing to ensure that<br />

activities can be done within the required time<br />

periods<br />

– Prioritisation and alignment of activities<br />

across functions to ensure that maintenance<br />

opportunities (e.g. during unplanned<br />

plant shutdown) are always taken and<br />

that maintenance activities are prioritised<br />

appropriately with respect to other activities<br />

16