3<br />
Key Integrity Barriers<br />
Topic 10 – Pressure Vessels<br />
• Pressure vessels are key components in a<br />
pressurised containment system. Vessels facilitate<br />
hydrocarbon processing such as separation, mixing,<br />
distillation, reaction, etc.<br />
• The critical issue for pressure vessels is ensuring<br />
that the periodic inspections have been identified,<br />
carried out to the full requirement, results assessed<br />
and that there are none overdue. Vessel failure<br />
usually occurs as a result of material degradation<br />
(from corrosion or erosion, etc.) and it is critical that<br />
inspections take place in order to understand the<br />
status of the vessels’ structural integrity.<br />
• There are several inspection techniques ranging<br />
from non-destructive testing (NDT) methods<br />
such as ultrasonic inspections and radiography to<br />
external visual or internal inspections.<br />
<strong>HSSE</strong> <strong>Management</strong> <strong>Tours</strong>:<br />
Asset Integrity Guide<br />
• All deferred inspections need to be done against<br />
the background of an agreed and robust system for<br />
management of deferrals that is suitably approved.<br />
Just as critical, is ensuring that the required tests<br />
and inspections are carried out appropriately and<br />
abnormal results are assessed by a competent<br />
person.<br />