23.12.2012 Views

electrical data - Mitsubishi Heavy Industries

electrical data - Mitsubishi Heavy Industries

electrical data - Mitsubishi Heavy Industries

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Power supply remote operation<br />

When the remote part on indoor unit PCB is modified, the air conditioner is turned ON-OFF by power supply ON-OFF operation<br />

without using remote control switch.<br />

After the power supply remote operation, the operation contents can be modified by the remote controller.<br />

(1) Operation contents<br />

(a) Heat pump type<br />

Power supply ON<br />

(2) Modification method<br />

• 20, 28, 32,40 models<br />

3-minute timer<br />

operation<br />

(b) Cooling only type<br />

Power supply ON<br />

3-minute timer<br />

operation<br />

Start operation<br />

Start operation<br />

Solder the high-speed switching diode (manufacturer: Matsushita, Manufacture type No.: MA165) to “Remote” part on the<br />

PCB in the direction as shown in the diagram below.<br />

Operation change<br />

Set temperature<br />

Air capacity change<br />

Flap<br />

Timer<br />

Operation change<br />

Set temperature<br />

Air capacity change<br />

Flap<br />

Timer<br />

AUTO<br />

COOL: 26˚C<br />

DRY : 25˚C<br />

HEA T:25˚C<br />

AUTO<br />

AUTO<br />

Continuous<br />

AUTO<br />

COOL: 26˚C<br />

DRY: 25˚C<br />

AUTO<br />

AUTO<br />

Continuous<br />

Power supply OFF<br />

Power supply OFF<br />

SRK-H<br />

Air conditioner<br />

STOP<br />

Air conditioner<br />

STOP<br />

55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!