23.12.2021 Views

potluri-unit8-final-1

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COLUMN SPACING

LINES

FLOOR FRAMING

CANTALIVERED PAST

COLUMN LINE (TYP.)

3" CONCRETE SLAB

AT L2

W21X62 STEEL BEAM

(TYP.)

SLAB EDGE

COORIDNATED WITH

STAIRS

W30X116 STEEL

BEAM

(TYP.)

GENERAL NOTES

1

a1

a2 a2.8a3 a4 a5 aA201 a6 a7 a8 a9 a10

10' - 2" 19' - 6" 4' - 2" 20' - 8" 31' - 8" 21' - 6" 9' - 8" 21' - 4" 31' - 0" 30' - 0"

1

aA301d

a/01/ Plan Level L2a/ All/ Framing (S120

x240)

1" = 20'-0"

1. REFER TO MATERIALS NARRATIVE FOR ADDITIONAL INFOR-

MATION ON TYPICAL CONDITIONS

2. COLUMNS/POSTS SIZE AND WD./STEEL/CFMF AS INDICATED.

BASE PLATE AT FOUND. BM./HEADER CONNECTION-TYPES

AS SHOWN (TYP.)

3. BEAMS/HEADERS SOZE & WD./STEEL/CFMF AS SHOWN. COL/

POST CONNECTION-TYPES AS SHOWN (TYP.)

1

199' - 8"

4. JOISTS (FLOOR/ROOF) SIZE & WD./STEEL/CFMF AS INDICATED

(TYP.)

5. DECKING (FLOOR/ROOF) WD./STEEL/ AS INDICATED, WITH

SPAN AS SHOWN (TYP.)

6. CONC. SLAB THICKNESS & REINF. AS INDICATED (IF PRESENT),

(TYP.)

7' - 0"

6' - 10 1/32"

19' - 5 31/32"

2' - 10"

6' - 10"

4' - 0"

29' - 2" 6' - 2"

15' - 4"

97' - 8"

DIMENSIONS TYP. AT

MIRRORED SIDE

HHS 6X4 STEEL

TUBES BEHIND

CURTAIN WALL

aE.2

aD.4

DRAWING LEGEND

aH

aG

aF

aE

aD

aC

8 X 8 STEEL

COLUMNS 1 aA202

CONT. TO FLOOR

FRAMING BELOW

INTERSECTIONS OF

COLUMN LINES

MARK COLUMN

LOCATIONS

8 X 8 STEEL

COLUMNS BEARING

ON BEAM BELOW

aB

aA

LINE OF "PLACE-

HOLDER" OBJECT (TO

BE DEVELOPED).

AREA TO COORD.;

AREA/ITEM REVISED

(RED, THEN BLACK).

LTU CoAD ARC 2313

Project Source

Sheet Issued

Sheet Title

Construction Systems 1

Poetry Foundation

06 Dec 2021 Un8

Framing Plan/ Level

L2/ Overall (x240)

Manasa Potluri, Fall 2021

Chicago, Illinois

John Ronan

aS120

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!