HHS 4"X6" STEEL

TUBES BEHIND

CURTAIN WALL

PRE-FINISHED ALUM.

COPING EXTENDER

WITH RETAINER CLIP

2" METAL PANEL

RAINSCREEN

CLADDING

SYSTEM, WITH 2"

HORIZ.

METAL Z-FURRING

TYPE MTL-1

2" METAL PANEL

RAINSCREEN

CLADDING

SYSTEM, WITH 2"

HORIZ.

METAL Z-FURRING

TYPE MTL-2

ALUMINUM FRAMED

CURTAIWALL

SYSTEM

W/INSULATED

GLAZING BEYOND

METAL PANEL

SYSTEM

ENTRANCE OPENING

TO BE

COORDINATED

8' - 1"

12' - 6"

a10

a9

a8

a7

a6

199' - 8"

a5

a4

1

aA301d

a3 a2.8

30' - 0" 31' - 0" 21' - 4" 9' - 8" 21' - 6" 31' - 8" 20' - 8" 4' - 2" 19' - 6" 10' - 2"

a2

a1

15' - 2"

20' - 2"

12' - 0"

47' - 4"

LINE OF SKYLIGHT

SYS.

STRUCTURAL

FRAMING, SEE

STRUCTURAL

DRAWINGS FOR

SIZING, TYPE AND

LOCATION..

DOOR SYS TO BE

COORDINATED

FINISH GRADE

C.I.P. CONCRETE

FOUNDATION

SYSTEM,

SEE STRUCTURAL

FRAMING DRAWINGS

Roof a

35' - 4"

Level 2 a

20' - 2"

Level 1 all

0' - 0"

Level 0 a c

-12' - 0"

ENCLOSURE TO

GROUND

CONNECTION TO BE

COORDINATED

LTU CoAD ARC 2313

Project Source

Sheet Issued

Construction Systems 1

Poetry Foundation

06 Dec 2021 Un8

Manasa Potluri, Fall 2021

Chicago, Illinois

John Ronan

GENERAL NOTES

1

a/01/ Ext. Elevation "N"/ Street Entry Long/

Overall/ (A201 x240)

1" = 20'-0"

1. REFER TO MATERIALS NARRATIVE FOR ADDITIONAL

INFORMATION ON TYPICAL CONDITIONS.

2. REFER TO DETAILS & OTHER DWGS. FOR MATL'S NOT

NOTED.

3. 2"METAL PANEL RAINSCREEN CLADDING SYSTEM, WITH 2"

HORIZ. METAL Z-FURRING (TYP.)

4. FLASH. SYS: SHT. MTL. FLASHING WITH DRIP, OVER

SUBSTRATE AS NOTED

7. ALUM. CURTAINWALL SYSTEM: PRE-FN. ALUM. FRAMING,

INSUL. GLASS

8. MEMB. ROOFING SYS.: FULLY ADHERED MEMBRANE

ROOFING

9. ROOFING TERMINATION SYS: SHT. MTL COUNTER- FLASHING

& EDGE TRIM

10. TAPERED ROOF INSULATION (SLOPE 1/4" MIN.)

11. RIGID BOARD ROOF INSULATION (MIN. THICKNESS AS

REQ'D PER ENERGY CODE CLACS.)

12. ALUMINUM-FRAMED SLOPED GLAZED SKYLIGHT

PLACED ON 6" CFMF CURB

13. METAL FLASHING AT SKYLIGHT CURB BASE AS PER

ROOFING MANUFACTURER'S REQUIREMENTS.

14. GC TO COORDINATE INSTALLATION OF ROOFING WITH

ROOF DRAINAGE ASSEMBLIES AND SYSTEM.

DRAWING LEGEND

LINE OF "PLACE-

HOLDER" OBJECT (TO

BE DEVELOPED).

AREA TO COORD.;

AREA/ITEM REVISED

(RED, THEN BLACK).

Sheet Title

Ext. Elevation 1/

Primary/ Overall

(x240)

aA201

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!