LINE OF SKYLIGHT

SYS.

PRE-FINISHED ALUM.

COPING EXTENDER

WITH RETAINER CLIP

2" METAL PANEL

RAINSCREEN

CLADDING

SYSTEM, WITH 2"

HORIZ.

METAL Z-FURRING

TYPE MTL-1

2" PERFORATED

METAL PANEL

TRANSPARENT

SYSTEM

CURTAIN WALL SYS.

BEYOND METAL

PANEL SYS.

LINE OF CONCRETE

FOUNDATION

FOOTINGS

GENERAL NOTES

1

aA aB aC aD

97' - 8"

aD.4

aE aF aG aH

aE.2

15' - 4" 29' - 2" 6' - 2" 4' - 0" 6' - 10" 2' - 10" 19' - 5 31/32" 6' - 10 1/32" 7' - 0"

a/02/ Ext. Elevation "E"/ Street Entry Short/

Enlarged/ (A202 x120)

1" = 10'-0"

1. REFER TO MATERIALS NARRATIVE FOR ADDITIONAL

INFORMATION ON TYPICAL CONDITIONS.

2. REFER TO DETAILS & OTHER DWGS. FOR MATL'S NOT

NOTED.

3. 2"METAL PANEL RAINSCREEN CLADDING SYSTEM, WITH 2"

HORIZ. METAL Z-FURRING (TYP.)

4. FLASH. SYS: SHT. MTL. FLASHING WITH DRIP, OVER

SUBSTRATE AS NOTED

7. ALUM. CURTAINWALL SYSTEM: PRE-FN. ALUM. FRAMING,

INSUL. GLASS

8. MEMB. ROOFING SYS.: FULLY ADHERED MEMBRANE

ROOFING

9. ROOFING TERMINATION SYS: SHT. MTL COUNTER- FLASHING

& EDGE TRIM

10. TAPERED ROOF INSULATION (SLOPE 1/4" MIN.)

11. RIGID BOARD ROOF INSULATION (MIN. THICKNESS AS

REQ'D PER ENERGY CODE CLACS.)

12. ALUMINUM-FRAMED SLOPED GLAZED SKYLIGHT

PLACED ON 6" CFMF CURB

13. METAL FLASHING AT SKYLIGHT CURB BASE AS PER

ROOFING MANUFACTURER'S REQUIREMENTS.

14. GC TO COORDINATE INSTALLATION OF ROOFING WITH

ROOF DRAINAGE ASSEMBLIES AND SYSTEM.

8' - 1"

12' - 6"

16' - 8"

1' - 6"

12' - 0" 20' - 2" 15' - 2"

48' - 10"

ALUMINUM FRAMED

CURTAIWALL

SYSTEM

W/INSULATED

GLAZING

STRUCTURAL

FRAMING, SEE

STRUCTURAL

DRAWINGS FOR

SIZING, TYPE AND

LOCATION

HHS 6"X4" STEEL

TUBES BEHIND

CURTAIN WALL

FINISH GRADE

DRAWING LEGEND

Roof a

35' - 4"

Level 2 a

20' - 2"

C.I.P. CONCRETE

FOUNDATION

SYSTEM,

SEE STRUCTURAL

FRAMING DRAWINGS

Level 1 all

0' - 0"

Level 0 a c

-12' - 0"

LINE OF "PLACE-

HOLDER" OBJECT (TO

BE DEVELOPED).

AREA TO COORD.;

AREA/ITEM REVISED

(RED, THEN BLACK).

LTU CoAD ARC 2313

Project Source

Sheet Issued

Sheet Title

Construction Systems 1

Poetry Foundation

06 Dec 2021 Un8

Manasa Potluri, Fall 2021

Chicago, Illinois

John Ronan

Ext. Elevation 2/

Adjacent/ Enlarged

(x120)

aA202