Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
RIGID BOARD ROOF
INSULATION (MIN.
THICKNESS AS
REQ'D PER ENERGY
CODE CALCS.)
ALUM.
CURTAINWALL
SYS. WITH 1"
INSULATED
GLAZING (TYP.)
STRUCTURAL
STEEL FRAMING,
SEE STRUCTURAL
PLANS
2" PERFORATED
METAL PANEL
TRANSPARENT
SYSTEM
GLASS RAILING
STAIR SYSTEM
INTERIOR WALL GWB
3.125
ENTRY WAY - 5"
CURTAIN WALL
LINE OF EXISTING
GRADE
LINE OF EXCAVATION
CUT
UNDISTRIBUTED SOIL
aH aG aF
7' - 0" 6' - 10 1/32"
22' - 3 31/32"
aE
10' - 10"
aD aC
97' - 8"
6' - 2"
29' - 2"
aB
15' - 4"
aA
15' - 2"
20' - 2"
12' - 0"
47' - 4"
FULLY ADHERED
MEMBRANE
ROOFING
(TYP.) OVER
TAPERED
INSULATION
(1/4" SLOPE MIN.)
PRE-FINISHED
EXTRUDED ALUM.
COPING SYSTEM
EXTERIOR WALL MS
6" - ROOF PARAPET
EXTERIOR WALL MS
6"
Roof a
35' - 4"
WALL OPENING -
CURTAIN WALL 5"
2" METAL PANEL
SYSTEM
Level 2 a
20' - 2"
EXTERIOR WALL
CMU 8"
CEILING
RATED INTERIOR
WALLS MS 4.75"
Level 1 all
0' - 0"
METAL PANEL CLAD.
SYS. AT MAS. LEDGE
AT TOP OF
FOUNDATION WALL
(TYP.)
Level 0 a c
-12' - 0"
COMPACTED FILL
LTU CoAD ARC 2313
Project Source
Sheet Issued
Construction Systems 1
Poetry Foundation
06 Dec 2021 Un8
Manasa Potluri, Fall 2021
Chicago, Illinois
John Ronan
GENERAL NOTES
1
a/05/ Bldg. Section 1d "N-S, to E"/ Ext.
Enclosure/ (A301d x120)
1" = 10'-0"
1. REFER TO MATERIALS NARRATIVE FOR ADDITIONAL
INFORMATION ON TYPICAL CONDITIONS.
2. REFER TO DETAILS & OTHER DWGS. FOR MATL'S NOT
NOTED.
3. 2"METAL PANEL RAINSCREEN CLADDING SYSTEM, WITH 2"
HORIZ. METAL Z-FURRING (TYP.)
4. FLASH. SYS: SHT. MTL. FLASHING WITH DRIP, OVER
SUBSTRATE AS NOTED
7. ALUM. CURTAINWALL SYSTEM: PRE-FN. ALUM. FRAMING,
INSUL. GLASS
8. MEMB. ROOFING SYS.: FULLY ADHERED MEMBRANE
ROOFING
9. ROOFING TERMINATION SYS: SHT. MTL COUNTER- FLASHING
& EDGE TRIM
10. TAPERED ROOF INSULATION (SLOPE 1/4" MIN.)
11. RIGID BOARD ROOF INSULATION (MIN. THICKNESS AS
REQ'D PER ENERGY CODE CLACS.)
12. ALUMINUM-FRAMED SLOPED GLAZED SKYLIGHT
PLACED ON 6" CFMF CURB
13. METAL FLASHING AT SKYLIGHT CURB BASE AS PER
ROOFING MANUFACTURER'S REQUIREMENTS.
14. GC TO COORDINATE INSTALLATION OF ROOFING WITH
ROOF DRAINAGE ASSEMBLIES AND SYSTEM.
BACKFILL (TO BE
REVISED)
DRAWING LEGEND
LINE OF "PLACE-
HOLDER" OBJECT (TO
BE DEVELOPED).
AREA TO COORD.;
AREA/ITEM REVISED
(RED, THEN BLACK).
Sheet Title
Bldg. Section 1d/
Ext. Enclosure
Horiz. & Vert.
aA301d