a1

2" RIGID BOARD

CONTINUOUS

INSULATION AT

EXTERIOR CLADDING

CAVITY

6" CFMF STUD-

FRAMED BACKUP

WITH EXT. GYP.

SHEATHING

1' - 4"

1' - 2"

2" METAL PANEL

RAINSCREEN

CLADDING SYSTEM,

WITH 2" HORIZ.

METAL Z-FURRING

CONT. AIR & WATER

PENETRATION

BARRIER (AWPB)

1' - 4"

1' - 2"

0' - 9"

CONT. 3" SPRAY

FOAM INSUL. WITH

VAPOR RETARDER

LAYER AT INTERIOR

STUD CAVITY

aH

INTERIOR WALL GWB

4.875"

INTERIOR WALL GWB

3.125

8 X 8 STEEL COLUMN

(TYP.)

ENGAGED COLUMN

CENTERED ON

COLUMN LINES (TYP.)

EXTERIOR WALL

CMU 8"

30X116 STEEL BEAM

(TYP.)

SLAB ON GRADE AT

L1

INTERIOR WALL GWB

4.875"

1

a/62/ Plan Detail Callout L1/ Typ. Ext. Wall/

At Corner (A502 x08)

1 1/2" = 1'-0"

aA502

Sheet Title

Plan Detail/ Typical

Ext. Wall at Corner

(x08)

Sheet Issued

06 Dec 2021 Un8

Project Source

Poetry Foundation

Chicago, Illinois

John Ronan

LTU CoAD ARC 2313