23.12.2021 Views

potluri-unit8-final-1

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a1

1' - 4"

1' - 2"

PRE-FINISHED

EXTRUDED ALUM.

SILL FRAME-WEEP

FLASHING

INTEGRATED WITH

FRAME SYSTEM

5" CURTAIN WALL

CONT. 2X WOOD

BLOCKING

CFMF NESTED STUD

&

TRACK HORZ. SILL

MEMBER UNDER

OPENING

PRE-FINISHED

EXTRUDED ALUM.

SILL

EXTENDER,

INTEGRATED WITH

FRAME SYSTEM

EXTERIOR WALL MS

6"

8 X 8 STEEL COLUMN

(TYP.)

2" BD. INSUL. WITH Z-

FURRING AT 24" O.C.

2"METAL PANEL

RAINSCREEN

CLADDING SYSTEM,

WITH 2" HORIZ.

METAL

Z-FURRING (TYP.)

LW 3" CONCRETE

SLAB

Level 2 a

20' - 2"

INTERIOR WALL AT

SLAB FOR

CONTINUOUS

INSULATION

21X62 STEEL BEAM

(TYP.)

30X116 STEEL BEAM

(TYP.)

EXTERIOR WALL

CMU 8"

1

a/63/ Section Detail/ WS1 Callout L2/

Typical Wall/ At Intermed Lvl/ (A552 x08)

1 1/2" = 1'-0"

aA552

Sheet Title

Section Detail/

Typical Ext. Wall at

Intermed Lvl (x08)

Sheet Issued

06 Dec 2021 Un8

Project Source

Poetry Foundation

Chicago, Illinois

John Ronan

LTU CoAD ARC 2313

Construction Systems 1

Manasa Potluri, Fall 2021

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!