23.12.2021 Views

potluri-unit8-final-1

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ALUMINUM COPING

OVER PARAPET

SLOPED ROOF

MEMBRANE

2" METAL ROOF

DECK

GWB CEILING

DROPPED TO ALLOW

FOR MECHANICAL

EQUIPMENT ABOVE

EXT. METAL STUD

WALL (TYP.)

1X4 TROFFER LIGHT

GWB CEILING

EXT. CMU WALL

(TYP.)

PERFORATED

METAL SHEATHING

(TYP.)

2X2 TROFFER LIGHT

MEZZANINE

BUILT-IN BOOK

SHELVING

STEEL DOOR

GENERAL NOTES

1

a1 a2 a2.8 a3

10' - 3 3/4" 9' - 0"

a/21/ Int. Space Section "E-W, to N"/ Int.

Elev. Library/ (I 401 x64)

3/16" = 1'-0"

1. REFER TO MATERIALS NARRATIVE FOR ADDITIONAL

INFORMATION ON TYPICAL CONDITIONS.

2. GWB CEILING: 5/8" GWB ON STL JOISTS, PTD.

3. GWB REVEAL AT PERIMETER OF ALL GWB AREAS AT

ADJACENT MATERIALS, PTD. BLACK.

4. 24"x24" ACOUSTICAL CEILING TILES WITH CONCEALED GRID

SUSPENSION. SEE PROJECT SPECIFICATIONS FOR ADDN'L

FRAMING AND SUSPENSION REQUIREMENTS

33' - 10"

10' - 2" 19' - 6" 4' - 2"

ACT-1

ACT-1

5. 1/2" THIK, VENEER-FACED INTERIOR WOOD PANELING W/ 1/2"

METAL

REVEAL AT ALL PANEL JOINTS. SEE PROJECT SPECIFICATIONS

FOR

FURRING AND FASTENING REQUIREMENTS TO METAL STUD

FRAMED

SUBSTRATE. NATURAL CLEAR STAIN FINISH,

6. RECESSED BOOK SHELVING TO MATCH WOOD PANELLING.

8' - 0" 1' - 4" 8' - 0"

15' - 2"

20' - 2"

35' - 4"

Roof a

35' - 4"

Level 2 a

20' - 2"

Level 1 all

0' - 0"

7. SCORED CONCRETE FLOOR FINISH: PREP, SEAL, STAIN

PER PROJECT

SPECIFICATIONS. CONTROL JOINTS TO BE TOOLED AT THE

TIME OF

PLACEMENT. LAYOUT PER FINISH FLOOR PLAN

8. ACT-1: ACOUSTIC CEILING TILE

PAINTED GYPSUM

WALL BOARD

STRUCTURAL

GLAZING SYSTEM

WOOD PANEL

DOOR

IN WALL SYSTEM

DOOR FRAME

BEHIND WALL

INTERIOR GLAZING

GLASS GAURDRAIL

MULLION

STAINED MAPLE

WOOD PANELING

PANEL EDGES ALIGN

TO BOOKSHELVES

BELOW

PENDANT LIGHT

FIXTURE

RECTANGULAR

WOOD DESKS

DRAWING LEGEND

LINE OF "PLACE-

HOLDER" OBJECT (TO

BE DEVELOPED).

AREA TO COORD.;

AREA/ITEM REVISED

(RED, THEN BLACK).

LTU CoAD ARC 2313

Project Source

Sheet Issued

Sheet Title

Construction Systems 1

Poetry Foundation

06 Dec 2021 Un8

Manasa Potluri, Fall 2021

Chicago, Illinois

John Ronan

Interior Elevation/

Level L1 S1/ Library

"N" (x32)

aI 401

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!