am - Hanford Site
am - Hanford Site
am - Hanford Site
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Y,<br />
N<br />
N<br />
1<br />
Vert eationNall a ^<br />
tlon Design Document<br />
Requirement<br />
Number<br />
Source Requirement Text<br />
R • Review<br />
A • Analysis<br />
Reference<br />
(Where is this requirement<br />
T • Test Incorporated in the design)<br />
_ Insialliclion<br />
926 TA•111.2000 Pro equisdes:<br />
Construction, modifications, and repairs affecting the test bounda ry snali be complete and the inlet and discharge openings of the duct or housing<br />
(sealed before the test is sta rted. All elect rical, piping, and instrument connections shall be complete ant: all permanent seals shall be installed<br />
before the les t is starled, co' pressure deca y IaSbn^ the volurno of the ";es ura ; Z:alculated 'a<br />
927 TA•111.3000 Test Equipment:<br />
(a) pressurization source<br />
(b) covers to seal test boundaries<br />
(c) clock or timer accurate to + 1-1.0 second<br />
(d) pressure indicating device accurate to +1 . 0.1 in.<br />
(e) flowmeter or totalizing gas volume meter accurate to +1-5% (constant pressure method)<br />
(f) temperature indicating device accurate to +/- 0 .5 deg rees F<br />
(9) bubble solution for detecting air leaks (bubble method)<br />
(h) optional po rt able ele ct ronic sound detection equipment (audible leak method)<br />
ba ro meter<br />
^z i-<br />
7A4NOV00) PROCEDURAL^GI^IDELINES }"b, , ' .t^ , . " (1 r .`•.,.;o 5 i'R s (5 a ,>, 1 .UY 1^, !":.:}:.`Kr as T ,.,(x1 u uYh ^r`+ 4 M^ ; nom ; s^ i<br />
xx{{<br />
SS.# ^ ..J}!T7('^F... •£f?, 3<br />
/fit<br />
.: t1.7"' Y? r r^'r<br />
928 TA-111.4100 Constant Pressure Mefhod:<br />
(a) Connect the pressuriza ti on source to the duct or housing.<br />
(b) Connect the flowmeter or totalizing gas volume meter between the pressurization source and the housing (downstre<strong>am</strong> of the th rottling valve. I<br />
if used).<br />
(c) Install temperature and p ressure indicating devices so that they will indicate representative temperature and press ure Inside the duct or<br />
housing being tested.<br />
(d) Seal test bou nd aries and close access doo rs In the normal manner.<br />
except for sealing the tempora ry blank-off panels,<br />
Do not use tempora ry sealants, duct tape, or similar tempora ry materials<br />
(e) Start the pressu ri r<br />
zation source and operate it until the maximum operating pressure Is acNeved. Maintain p ressure constant with the flow<br />
control device until temperature remains constant witfun +0.5 deg F (0.25 deg C) for a minimum of 10 minutes. Record the ini ti al stabilized<br />
.pressure, temperature and barometric pressure.<br />
929 TA-111.4100 Constant Pressure Method:<br />
(f) Measure the f low rate of the air being added to or removed from the duct or housin g while maintaining the maximum operating pressure within<br />
+/-0.1 in. w.g. (0.025 Kpa(gage)). When using the flow meter, record flow readings once a minute for a 5 minute continuous period and average the<br />
! readings to calculate the measured leak rate, When using a totalizing gas volume meter, measure the total volume of air for a 10 minute<br />
(<br />
period and divide the riiea5ured vuiurne dy time (10 rridrule5) iu caiuuiaie the measured ieak raie.<br />
and barometric p<br />
Record final preaaure, iemperaiura i<br />
re l<br />
l coni;nuous<br />
ssure.<br />
(g ) Conve rt the rinal calculated leak rate to standard cubic feet per minute (cubic meters per second) in accordance with the method illustrated In<br />
AC IH Indust ri a VerAila Icn A Manual of Recommended Practice.<br />
930 TA-111.4200 Pressure Dewy Test:<br />
(a) Connect the pressuriza tion source (with a leak tight shulo tf valve) to the duct or lousing.<br />
(b) Install the tempera ture and pressu re indicating deices where they will indicate representative temperature and pressu re Inside the duct or<br />
housing being tested.<br />
(c) Seal test boundaries and close access doors in the normal manner. Do not use tempora ry sealants, duct tape, or similar tempora ry materials<br />
except for sealing the tempora ry blank-off panels.<br />
(d) Sta rt the pressurization source and operate until the pressure is 1.25 t ; mes the maximum operat i ng pressure (but not to exceed the structural<br />
capability pres sure). Maintain this p r e ssure constant with a flow control device anti( temperature remains constant within + 1-0 .5 deg F (0,25 deg C)<br />
f r a minimum of 10 minute s. Close shutoff valve.<br />
Date Printed: 21-Dec-C4 Ex<strong>am</strong>ple ASME AG-1 Compliance Matrix Page 90 of 110<br />
PC<br />
It<br />
'C<br />
t<br />
N<br />
V1<br />
A