TECHNICAL DATA SHEETS<br />
RPP-24544 REV Id<br />
<strong>am</strong>dO<br />
PROJECT: Final DBVS Design 145579-D-DS-036.1 REV.1<br />
OFF-GAS TREATMENT SYSTEM HEPA<br />
PROJECT NO.: 145579 FILTER SKID ASSEMBLY<br />
DESIGN AND FABRICATION<br />
C LI ENT: AMECE&E- Richland, Washington EQUIPMENT NO.:36-D5a-oo3<br />
BIDDER'S DRAWING AND DATA COMMITMENTS<br />
Vendor Shall supply all drawings. manuals and documentation in the qu<strong>am</strong>ffes indicated Approval drawings are due within the<br />
fisted number of calandar days after issue of the Purchase Order or Letter of Intent. The dates set out W drawing and data<br />
submissions wegmuemed by 6te emjneering desgn.Sched le of the project. The Vendor shafsuppry one Autocad disk file<br />
and requested mmtber of copies wiihin the Istednunber of calendar days. Foul drawings must be certified as correct and<br />
bear the Vendors n<strong>am</strong>e, equipment number and Purchase Order Number. Omvimi; Transmittals listing the document numbers.<br />
revison numbers,.quantf des, status and document types must be Included with all submissions<br />
(frrclnding electronic submittals)<br />
SEND ALL DOCUMENTS TO: DMJMH+N, Inc.<br />
dba DMJIM Technology<br />
Submit all documents Via courier service r 3250 Port of Benton Blvd<br />
Faxed documents must be followed by the originals. - Richland, WA 99354-1670<br />
Electronic E-mad or FTP Uansmissions of drawings & data must be copied to Attn- Project Records<br />
Document Control Phone: (509) 375-7856<br />
Always include. a transmittal Fax: (509)375-5331<br />
BIDDERS MUST PROVIDE ESTIMATED LEAD TIMES FOR APPROVAL DRAWINGS<br />
Proposal Bidder shall Include this data for each fleet - - REVIEW<br />
Review Required before ordering or sta rt of fabrication<br />
Final Required within 7 days Odor to shipment a nd before final payment<br />
ITEMS DUE<br />
WITHIN<br />
PROPOSAL REVIEW FINAL DESCRIPTION<br />
DAYS<br />
E+3 E+6 100Y. Design and Fabdcat on Package including:<br />
- Mecharecak Structuraf and Electrical Drawings<br />
- Mechanical.Structural and Electrical Caludafionrs<br />
- Completed Equipment Data Sheers<br />
- Vendor Cut SheeWTedtnicaf Bmchers<br />
- BN of mat<br />
PO-21<br />
er ials<br />
When<br />
E:3 E+1 NCR's identified +3<br />
_ When<br />
E+3<br />
E+3<br />
E.3<br />
E+1<br />
Fabrication red-t'ure changes<br />
preliminary Data Package Incuding:<br />
-As-Bupf Drawings and Weld Maps<br />
- Fabrication Travler Closeout<br />
- Recommended spare parts and frequency of replacement<br />
- Rigging sketches<br />
- System assembly instructions<br />
i lentifred<br />
Prior<br />
FAT<br />
- Operation and maintenance manuals -<br />
- Completed Test results (document and video records)<br />
-Packing list and idenfrt lion of shipPmg supports<br />
Field Calibration Procedures and Reports<br />
- Inspection Reports<br />
-CoC's! C:MTRS<br />
-14ECinspection ceNfcate & electrornagnelic interference lest<br />
rest s<br />
OFF-GAS TREATMENT SYSTEM HEPA FILTER SVJD ASSEM13LY DESIGN AND FABRICATIOM<br />
21-Dec-D4.<br />
G5-277<br />
VENDOR<br />
COMMITMENT<br />
(DAYS)