TECHNICAL DATA SHEETS<br />

RPP-24544 REV Id<br />

<strong>am</strong>dO<br />

PROJECT: Final DBVS Design 145579-D-DS-036.1 REV.1<br />

OFF-GAS TREATMENT SYSTEM HEPA<br />

PROJECT NO.: 145579 FILTER SKID ASSEMBLY<br />

DESIGN AND FABRICATION<br />

C LI ENT: AMECE&E- Richland, Washington EQUIPMENT NO.:36-D5a-oo3<br />

BIDDER'S DRAWING AND DATA COMMITMENTS<br />

Vendor Shall supply all drawings. manuals and documentation in the qu<strong>am</strong>ffes indicated Approval drawings are due within the<br />

fisted number of calandar days after issue of the Purchase Order or Letter of Intent. The dates set out W drawing and data<br />

submissions wegmuemed by 6te emjneering desgn.Sched le of the project. The Vendor shafsuppry one Autocad disk file<br />

and requested mmtber of copies wiihin the Istednunber of calendar days. Foul drawings must be certified as correct and<br />

bear the Vendors n<strong>am</strong>e, equipment number and Purchase Order Number. Omvimi; Transmittals listing the document numbers.<br />

revison numbers,.quantf des, status and document types must be Included with all submissions<br />

(frrclnding electronic submittals)<br />

SEND ALL DOCUMENTS TO: DMJMH+N, Inc.<br />

dba DMJIM Technology<br />

Submit all documents Via courier service r 3250 Port of Benton Blvd<br />

Faxed documents must be followed by the originals. - Richland, WA 99354-1670<br />

Electronic E-mad or FTP Uansmissions of drawings & data must be copied to Attn- Project Records<br />

Document Control Phone: (509) 375-7856<br />

Always include. a transmittal Fax: (509)375-5331<br />

BIDDERS MUST PROVIDE ESTIMATED LEAD TIMES FOR APPROVAL DRAWINGS<br />

Proposal Bidder shall Include this data for each fleet - - REVIEW<br />

Review Required before ordering or sta rt of fabrication<br />

Final Required within 7 days Odor to shipment a nd before final payment<br />

ITEMS DUE<br />

WITHIN<br />

PROPOSAL REVIEW FINAL DESCRIPTION<br />

DAYS<br />

E+3 E+6 100Y. Design and Fabdcat on Package including:<br />

- Mecharecak Structuraf and Electrical Drawings<br />

- Mechanical.Structural and Electrical Caludafionrs<br />

- Completed Equipment Data Sheers<br />

- Vendor Cut SheeWTedtnicaf Bmchers<br />

- BN of mat<br />

PO-21<br />

er ials<br />

When<br />

E:3 E+1 NCR's identified +3<br />

_ When<br />

E+3<br />

E+3<br />

E.3<br />

E+1<br />

Fabrication red-t'ure changes<br />

preliminary Data Package Incuding:<br />

-As-Bupf Drawings and Weld Maps<br />

- Fabrication Travler Closeout<br />

- Recommended spare parts and frequency of replacement<br />

- Rigging sketches<br />

- System assembly instructions<br />

i lentifred<br />

Prior<br />

FAT<br />

- Operation and maintenance manuals -<br />

- Completed Test results (document and video records)<br />

-Packing list and idenfrt lion of shipPmg supports<br />

Field Calibration Procedures and Reports<br />

- Inspection Reports<br />

-CoC's! C:MTRS<br />

-14ECinspection ceNfcate & electrornagnelic interference lest<br />

rest s<br />

OFF-GAS TREATMENT SYSTEM HEPA FILTER SVJD ASSEM13LY DESIGN AND FABRICATIOM<br />

21-Dec-D4.<br />

G5-277<br />

VENDOR<br />

COMMITMENT<br />

(DAYS)