24.12.2012 Views

am - Hanford Site

am - Hanford Site

am - Hanford Site

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

V1<br />

t<br />

N<br />

J<br />

1<br />

Re q uirement<br />

Nurnbar<br />

Source Requirement Text<br />

1 163 1 1 .3 Connect a row detection instrument s<strong>am</strong>ple lines to the upstre<strong>am</strong> and downs re<strong>am</strong> s<strong>am</strong>ple ports.<br />

11B4 10.5.4 Check the background particulate concentration upstre<strong>am</strong> and downstre<strong>am</strong> of the HEPA filler bank. The preirjection background levels shall be<br />

staoie iv ensure p roper instrument response. Tr;e levels shall not interfere wit the detecl0?s ability to cetect pe.-,vaticn smaller than the .maximum .<br />

.penetration all d by the tot progr<strong>am</strong> or project s ecification .<br />

1165 10.55 Cann ct DOP aerosol generator to in j ection port and start injection.<br />

1166 10. 5.0 Record ypstrearn concentration reading.<br />

1167 10,5.7 Record downstre<strong>am</strong> concentration reading<br />

1168 10.5.8 Repeat steps from paras. 10.5.6 and 10.5.7 url:l readings are repeatable winln -/-5% of respective p r evious rsaoings. Use final set of readings<br />

to calculate penetration.<br />

1169 10.5 g Calculate penetration Section 31. If calculated Renetralion exceeds the acceptance cinteria, noti fy the owner.<br />

1170 10.5.10 When the housing contains more than one bank of HEPA Peters in series which are requi red to be leak lesled, re peat the procedure for each<br />

bank.<br />

+171 10.6 ACceplance Criteria:<br />

All waole penetration shall be as staled in the lest poo ,<strong>am</strong> or proiect specifications.<br />

1172 '0.7 Report.,<br />

The test procecure shall include documentation of the results of the tests and conform to the owner's test progr<strong>am</strong> or P ro ject specifications.<br />

R H ., J\<br />

a'. k C'^.. ,<br />

VeriticationNalidA l<br />

lion<br />

I Design Document<br />

R • Rill<br />

Reference<br />

A •Analysts (Where is this requirement<br />

T • Test incorporated In the design)<br />

4w<br />

In^(^.R:^13J'^.`^`t . „t ABSORBER'B"AIIC)NI:Pl^4C.^'.LEAiC2`TEST"?S1F't3 ,4^'^^eS^M,"S?^'i^ fA^'4?., ^?a^Yi ^fi^r ^s^.i^ .^ . .` . •b`'F „ >;,.':. ,a' +^,.. ., . ^., ,,; ^ , r .. _ *.^^<br />

1173 11.1 Purpose:<br />

This test shell be used for both acceptance and su rveillance leak testing of the installed adsorber bank. It s<strong>am</strong>ples of adsorbent are to be taken<br />

for laboratory testing Section 15). remove such s<strong>am</strong>ples rior to this test. and restore bank to 0 erati co ndition.<br />

1174 11.2 Summary a Method'<br />

A ha lide challenge gas is Injected into the airstre<strong>am</strong> upstre<strong>am</strong> of the absorber bank. Concen trations shall be determined upstre<strong>am</strong> and<br />

downstre<strong>am</strong> of the bank. Percent penetration Is determined from the rat 'o of downstre<strong>am</strong> to upstre<strong>am</strong> concentral:on rSectlon 3 .<br />

1175 11.3 Prerequis il es"<br />

The upst re<strong>am</strong> s<strong>am</strong>ple one injection points to be used shall be (hose qualified per Section 9 Downstre<strong>am</strong> tr s<strong>am</strong>ple p e po inis s h ait bbe downstre<strong>am</strong> of<br />

+<br />

Ji 1 I..4<br />

a fan or downstre<strong>am</strong> s<strong>am</strong>ple manifolds shall be qualified per ASME N50 9<br />

..<br />

vr<br />

Y 3814 r J T f` rb µ :,777 4F ^<br />

J f APP.AR{iTU$ . , + . ...,. _ 4 .. ! , 2Y^:h r. , . yr i L r ,.-, 7<br />

r,<br />

5 aV' . '<br />

,a n. r. ...G 9 73Yf YA^r??,L.. `<br />

s '3 ' -7"3 Y , fir. ., c ,'e, s b Y ' "!wv ° r<br />

1176 11.4.1 Halide as R-1 1 is preferred: R-112 or R-1 2A is an acceptable,altemate.<br />

1 1177 1 11, 4 .2 Hailoe q as generator.<br />

1178 1 11.4.3 Halide gas deteclion instrument.<br />

1179 11.4.4 System fan or auxilia ry fan (for systems normally without fans) capable of producing the airflow specified In the test progr<strong>am</strong> or project<br />

specifications.<br />

NOTES:<br />

1) S<strong>am</strong>ple line lengths should be minimized to reduce s<strong>am</strong>ple response time and of equal lengths to eliminate time delay er ro rs.<br />

2) It may be necessa ry to operate system for a pe riod to purge all resldual challenge gas fro m a prior lest to reduce background<br />

c<br />

..,.<br />

1180<br />

w :,,.<br />

^^^^1i.5.><br />

11.5.1<br />

concentration Lip acceptable values<br />

..<br />

>,. 6,.K<br />

:<br />

5!° J ^^>. Or i` '^.^ ,itr rr ^+. i4 +9+. • ,x i;nr,^.in „xp<br />

F^FYOCEDUREr?` .^ a ... r x,. y<br />

Establish airflow through the adsorber bank at the flow rate specified by the tes<br />

&

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!