28.02.2023 Views

+IMPACT MAGAZINE ISSUE 22

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROJECT<br />

Environmental Consultants, Consulting Engineers and Project Managers<br />

the site itself – the way that we have designed the access<br />

and the way it links to the surrounding street networks,<br />

invites people to the building, and will invite people to<br />

ask questions about it as well,” says Sebetso.<br />

Mutale also pays frequent visits to the site. “You get the<br />

sense that this is a building where you would really feel<br />

welcome. This feels like a place where the light is going<br />

to be enough.” The goal is to maximise daylight, while<br />

providing glare control. According to Sebetso, modelling<br />

was done to optimise daylight and where not too much<br />

energy is needed to cool the space from heat gains that<br />

come from daylight. This includes occupant-controlled<br />

daylight glare, and a series of vertical and horizontal<br />

elements to create shading on the glass-glazed façades.<br />

“This particular site is really well orientated,” says Munnik,<br />

“which makes it a lot easier to manage the heat gain and<br />

natural lights, and to deal with the passive shading aspect<br />

of the façades.”<br />

A lot of thought also went into the parking space. “I<br />

know that Africa is taking a little bit longer to catch up<br />

on hybrid vehicles, but we tried to design the parking<br />

space in a way that makes people think about it for the<br />

future,” says Sebetso. The final building will have dedicated,<br />

convenient parking bays for hybrid vehicles and for those<br />

who carpool to work. A cyclist facility and showers also<br />

form part of the design, and Sebetos believes this too can<br />

usher in change. “When you walk around in Lusaka, a lot<br />

of people are walking, so I think they’re open to other<br />

Access to the building, and how it links with the street<br />

networks surrounding it, invites people in to the building.<br />

We are trailblazers, and it is<br />

something to be proud of.<br />

means of getting to work apart from driving. Their traffic<br />

is insane, often causing public transport to be unreliable.”<br />

The rating includes three innovation points for financial<br />

transparency towards the GBCSA, the fact that this is the<br />

first 5-Star Green Star rated building in Zambia – and the<br />

training of the entire project team.<br />

Mutale mentions that awareness and curiosity among<br />

their new neighbours is growing, holding them accountable<br />

for their actions now and after construction. For this to<br />

happen, the end users cannot go back to their conventional<br />

ways, and that is why a user guide has been created. “It’s<br />

a PDF document that’s not too technical,” Sebetso says,<br />

“so that anybody from any industry can understand it.<br />

It’s in basic language, and provides simple diagrams that<br />

people can understand, even if they don’t have a building<br />

or engineering background.”<br />

It is expected that construction will be completed in<br />

the middle of the year, after which further ratings may be<br />

pursued and FCB’s employees are ready to go all the way.<br />

“We are trailblazers,” adds Mutale, “and it is something<br />

to be proud of. It’s really to begin to derive the benefits<br />

of what this certification means to us as a business, and<br />

also for the community.”<br />

After construction, preferential parking will be given to electric<br />

and hybrid vehicles as well as those using carpools to get to work.<br />

42 POSITIVE IMPACT <strong>ISSUE</strong> <strong>22</strong><br />

DH Engineering Consultants is a Zambian based<br />

Engineering Consultancy firm providing Engineering<br />

Design, Supervision and Project Management Services<br />

countrywide. The firm has over 20 years experience<br />

and all Engineers are Registered with the Zambian<br />

Engineers Registration Board.<br />

The firm specialises in the design and supervision of<br />

Mechanical, Electrical and Plumbing Building Services,<br />

Fire Fighting Systems, and Petroleum Installations<br />

across all sectors of commerce, industry, agriculture<br />

and public infrastructure.<br />

The firm also provides Environmental Consultancy<br />

Services such as the preparation of Environmental<br />

Impact Assessments and Site Health and Safety Audits.<br />

Motswere - Prime Plaza ll<br />

MOTSWERE - PRIME PLAZA II<br />

Motswere Prime Plaza II, Plot 54359, CBD Gaborone<br />

5 Star Green Star – Office Design v1.1<br />

Motswere Prime Plaza II is an A-grade office space with three floors and two basement parking levels, making up a<br />

total floor area of 2 780m². It is the first phase of the upcoming office buildings in Prime Plaza II and is named after the<br />

I development and will consist of four commercial buildings in total.<br />

First Capital Bank, Lusaka<br />

stunning Leadwood Combretum trees that will still inhabit this piece of land. PPII is an addition to the existing Prime Plaza<br />

Sustainable building<br />

features include:<br />

Building tuning of the mechanical,<br />

electrical, wet services and irrigation<br />

services.<br />

Waste management during the<br />

construction phase as well as<br />

provision of recycling facilities for the<br />

operations phase.<br />

lighting power density, along with<br />

lighting zoning controls.<br />

Project team:<br />

AFRICA<br />

Botswana<br />

Building users being provided with<br />

a building users’ guide to help them<br />

maximise on the sustainable building<br />

features.<br />

Office Design v1.1<br />

5 Star Rating<br />

South African Excellence<br />

CERTIFIED MAY 2021<br />

Provision of preferential parking<br />

for fuel efficient transport and has<br />

cyclists’ facilities for building users as<br />

The use of a 132 kWp solar PV system<br />

with an estimated annual production<br />

of 234 MWh.<br />

well as visitors.<br />

Maximising on daylight while<br />

FIRST<br />

providing<br />

CAPITAL<br />

daylight glare control.<br />

BANK, LUSAKA<br />

Water efficiency achieved using<br />

low flush rate sanitaryware and use<br />

Corner Use of low Church VOC materials. Road and Chilubu Road, Fairview, Lusaka<br />

of non-potable water in the irrigation<br />

5 Star Low Green electric lighting Star levels and – low Office Design system. v1.1<br />

AFRICA<br />

Zambia<br />

The First Capital Bank head office is an A-grade office space with two wings, each of which has 3 floors and a shared lower<br />

totaL PointS:<br />

64<br />

category ScoreS:<br />

MANAGEMENT<br />

INDOOR ENVIRONMENTAL QUALITY<br />

OWNER<br />

MECHANICAL ENGINEER MAIN CONTRACTOR OCCUPANTIONAL HEALTH<br />

Primetime ground parking Holdings level. The GFA Ascend of the building Consulting is 3,820m². Engineers Red East Construction & SAFTEY MANAGER<br />

FLoor areaS:<br />

Time Projects is setting<br />

Red East<br />

a<br />

Construction<br />

ACCREDITED<br />

QUANTITY SURVEYORS PROJECT MANAGER new benchmark for green<br />

PROFFESSIONAL<br />

MLC Cost Consultants<br />

Time Projects Botswana LANDSCAPE<br />

TOTAL GROSS<br />

Solid Green Consulting<br />

MANAGEMENT COMPANY<br />

FLOOR AREA<br />

STRUCTURAL ENGINEERS ENVIRONMENTAL<br />

Blooms<br />

building ARCHITECT<br />

ADA practices Consulting Engineers by leading the way in green star<br />

(GFA): CATEGORY 2,780 SCORES: m2<br />

CONSULTANT<br />

Paul Munnik Architects<br />

Loci Environmental<br />

TOTAL<br />

Sustainable building SUSTAINABLE BUILDING<br />

COMMERCIAL<br />

ELECTRICAL features include: ENGINEER CONSULTANT<br />

FACILITIES MANAGEMENT<br />

OFFICE AREA: MANAGEMENT n/a<br />

AR Edwards & Associates Solid Green<br />

COMPANY<br />

certifications. A Time first, Projects Botswana for both Botswana CAR and Zambia.<br />

LIFT Building SPECIALIST tuning of the mechanical, WET SERVICESBuilding users being provided with<br />

PARKING<br />

AR Edwards & Associates Paul Munnik Architects<br />

AREA: INDOOR ENVIRONMENTAL 8,100 QUALITY m<br />

Leading the charge with three 5-Star Green Star 2<br />

electrical, wet services and lift<br />

a building users’ guide to help them<br />

services.<br />

maximise on the sustainable building<br />

ratings<br />

features.<br />

ENERGY<br />

Waste management during the<br />

construction phase as well as<br />

Provision of preferential parking<br />

and provision of a recycling Net facilities for the Zero for fuel efficient Carbon transport and cyclists’ rating.<br />

TRANSPORT<br />

operations phase.<br />

Maximising on daylight while<br />

providing daylight glare control.<br />

facilities for building users as well as<br />

visitors.<br />

Office Design v1.1<br />

5 Star Rating<br />

South African Excellence<br />

CERTIFIED NOVEMBR 20<strong>22</strong><br />

Water efficiency achieved using<br />

ENERGY<br />

TRANSPORT<br />

WATER<br />

MATERIALS<br />

LAND USE AND ECOLOGY<br />

EMISSIONS<br />

TOTAL POINTS:<br />

INNOVATIONS<br />

WATER<br />

71<br />

Consulting Engineers<br />

<strong>22</strong>6A NAPSA Complex<br />

Off Leopards Hill Road<br />

PO Box 37928<br />

Lusaka, Zambia<br />

Tel: +260 (211)<strong>22</strong>9555 /<strong>22</strong>7176<br />

+260 977 874162<br />

Email: dhec.lusaka@gmail.com<br />

Mashatu Terrace<br />

MOTSWERE MASHATU TERRACE - PRIME PLAZA II<br />

Motswere Prime Plaza II, Plot 54359, CBD Gaborone<br />

5 Star Green Star – Office Design v1.1<br />

Plot 74768, Corner 2nd Commercial & Western Commercial, New CBD- Gaborone<br />

5 Star Green Star – Office As Built v1.1<br />

Motswere Mashatu Terrace Prime Plaza is an II A-grade is an A-grade office space office with space and with East three and West floors Wing and two which basement have four parking floors and levels, three making floors, up a<br />

respectively and a shared ground and one basement parking levels, making up a total floor area of 7,390.2 m 2 . Mashatu<br />

total floor area of 2 780m². It is the first phase of the upcoming office buildings in Prime Plaza II and is named after the<br />

“Land of the Giants” is a development located in the rapidly development business district – Gaborone and has taken<br />

stunning inspiration Leadwood from its Combretum environment trees while that implementing will still inhabit sustainability this piece initiatives of land. PPII throughout is an addition the development. to the existing These Prime A-grade Plaza<br />

I development office buildings and are will the consist home to of the four Bank commercial Gaborone buildings and First in Capital total. Bank.<br />

Sustainable building<br />

features include:<br />

Sustainable building<br />

Sub-metering of major energy<br />

features consuming include: systems is in place.<br />

Gathering information is key to<br />

Building tuning of the mechanical,<br />

understanding and managing building<br />

electrical,<br />

systems<br />

wet<br />

and to<br />

services<br />

assess<br />

and<br />

opportunities<br />

irrigation<br />

services. for energy savings.<br />

Waste Minimisation management of Greenhouse during the<br />

construction Gas Emissions phase associated<br />

well as<br />

provision<br />

with operational<br />

of recycling<br />

energy<br />

facilities<br />

consumption<br />

for the<br />

is reduced. An energy model<br />

operations phase.<br />

of the building was generated<br />

Maximising and in the design on daylight stages while of the<br />

building compared to a notional<br />

providing daylight glare control.<br />

building model. The building design<br />

Use showed of low 100% VOC improvement materials. over a<br />

SANS 10400 notional building.<br />

Low electric lighting levels and low<br />

The project saves energy by providing<br />

lighting power density, along with<br />

office lighting that is not over<br />

lighting designed. zoning This controls. is achieved as the<br />

office lighting design achieves an<br />

average maintained illuminance level<br />

of no more than 400 Lux.<br />

Project team:<br />

OWNER<br />

Primetime Holdings<br />

PROJECT TEAM:<br />

ACCREDITED<br />

PROFFESSIONAL<br />

Solid OWNER Green Consulting<br />

Mashatu Body Corporate<br />

ARCHITECT<br />

Paul<br />

ACCREDITED<br />

Munnik Architects<br />

PROFFESSIONAL<br />

ELECTRICAL Solid Green Consulting ENGINEER<br />

AR ARCHITECT Edwards & Associates<br />

Paul Munnik Architects<br />

LIFT SPECIALIST<br />

AR Edwards & Associates<br />

AFRICA<br />

South Botswana Africa<br />

design of the building.<br />

and use of non-potable water in<br />

the irrigation system active during the<br />

call Building or tuning of the visit mechanical, us establishment at: phase.<br />

electrical, wet services and irrigation<br />

services.<br />

The use of a 248.64 kWp solar<br />

PV system with an estimated annual<br />

T +267 395 6080<br />

production of 408.010 MWh.<br />

W www.time.co.bw<br />

MAIN CONTRACTOR OCCUPANTIONAL HEALTH<br />

MECHANICAL ENGINEER<br />

Ascend Consulting Engineers<br />

QUANTITY SURVEYORS<br />

MLC Cost Consultants<br />

ELECTRICAL ENGINEER<br />

STRUCTURAL AR Edwards & Associates ENGINEERS<br />

ADA Consulting Engineers<br />

LIFT SPECIALIST<br />

SUSTAINABLE Schindler BUILDING<br />

CONSULTANT<br />

MECHANICAL ENGINEER<br />

Solid Acend Green Consulting Engineers<br />

Office As Design Built v1.1<br />

5 Star Rating<br />

South African Excellence<br />

CERTIFIED JUNE MAY 2021 20<strong>22</strong><br />

The project is targeting a Net<br />

Zero Carbon Rating. The Sustainable<br />

Initiatives will be implemented at<br />

a building level ensuring that the<br />

building is highly energy-efficient and<br />

the remaining energy demands is met<br />

Building by on-site users renewable being provided energy so with that<br />

a the building zero net users’ carbon guide emission to help on them an<br />

maximise annual basis. on the sustainable building<br />

features.<br />

All selected gaseous and fire<br />

suppression systems and thermal<br />

Provision of preferential parking<br />

insulants used for the development<br />

for fuel efficient transport and has<br />

have an Ozone Depleting Potential<br />

cyclists’ (ODP) of facilities zero, to eliminate for building any users as<br />

well contributions as visitors.<br />

long-term damage to<br />

the earth’s stratospheric ozone layer.<br />

Water efficiency achieved using<br />

low Evaporative flush rate cooling sanitaryware towers or and use<br />

of<br />

other<br />

non-potable<br />

evaporative<br />

water<br />

cooling<br />

in the<br />

systems<br />

irrigation<br />

that creates the risk of legionella<br />

system.<br />

disease are eliminated from the<br />

PROJECT MANAGER<br />

Time Projects Botswana<br />

QUANTITY SURVEYORS<br />

Waste management during the<br />

construction phase as well as<br />

provision of recycling facilities for the<br />

operations phase.<br />

Use of low VOC materials – paints,<br />

adhesives The use of and a 132 floor kWp coverings. solar PV system<br />

with an estimated annual production<br />

Low lighting power density, along<br />

with of 234 lighting MWh. zoning controls.<br />

Building users being provided with<br />

a building users’ guide to help them<br />

maximise on the sustainable building<br />

features.<br />

Provision of preferential parking<br />

for fuel efficient transport and has<br />

cyclists’ facilities for building users as<br />

well as visitors.<br />

Water efficiency achieved using<br />

low flush rate sanitaryware<br />

LANDSCAPE<br />

MAIN MANAGEMENT CONTRACTOR COMPANY<br />

MLC ENVIRONMENTAL<br />

Cost Consultants<br />

Red Blooms East Construction<br />

CONSULTANT<br />

SUSTAINABLE BUILDING<br />

Acacia, Prime Plaza,<br />

CONSULTANT<br />

Loci Environmental<br />

PROJECT Time Projects<br />

MANAGER<br />

Solid FACILITIES Green Consulting MANAGEMENT LANDSCAPE<br />

WET COMPANY SERVICES<br />

MANAGEMENT COMPANY<br />

Plot 74358, CBD,<br />

Paul Time Munnik Projects Architects Botswana Loci Environmental Pty Ltd<br />

Gaborone, Botswana<br />

WET SERVICES<br />

Paul Munnik Architects<br />

Red East Construction<br />

& SAFTEY MANAGER<br />

Red East Construction<br />

Level 1: Building Emissions<br />

(modelled)<br />

TOTAL 0% POINTS:<br />

totaL PointS:<br />

20<strong>22</strong>-07 to 2025-07<br />

61 64<br />

INNOVATIONS<br />

PROJECT INNOVATIONS TEAM:<br />

OWNER<br />

Mashatu Body Corporate<br />

ACCREDITED<br />

FLOOR AREAS:<br />

PROFFESSIONAL FLoor areaS:<br />

TOTAL GROSS<br />

Jeffy FLOOR Palamattam<br />

TOTAL<br />

AREA<br />

GROSS<br />

FLOOR AREA<br />

ARCHITECT<br />

TOTAL<br />

Paul COMMERCIAL Munnik TOTAL Architects<br />

COMMERCIAL<br />

CAR OFFICE AREA: n/a<br />

PARKING<br />

AREA:<br />

CAR<br />

n/a<br />

PARKING<br />

Botswana<br />

MASHATU TERRACE<br />

M<br />

N<br />

B<br />

In<br />

Mashatu Terrace achieved Net Zero Carbon Level<br />

measures:<br />

Passive design such as performance glazing<br />

CATEGORY<br />

Decreased category SCORES:<br />

lighting ScoreS: loads<br />

Increased MANAGEMENT MANAGEMENT fresh air flow which resulted in lower<br />

INDOOR<br />

INDOOR<br />

ENVIRONMENTAL<br />

ENVIRONMENTAL<br />

QUALITY<br />

QUALITY<br />

ENERGY<br />

ENERGY<br />

Sustainable building features include:<br />

TRANSPORT<br />

Passive design TRANSPORT such as performance glazing<br />

Decreased WATER lighting loads<br />

WATER<br />

Increased fresh air flow which resulted in lower HVA<br />

MATERIALS<br />

MATERIALS<br />

A PV system sized to 248.64 kWp which produce 40<br />

annually LAND USE AND ECOLOGY<br />

LAND USE AND ECOLOGY<br />

EMISSIONS<br />

EMISSIONS<br />

(GFA): 7 390.2m 2<br />

(GFA): 2,780 m 2<br />

OFFICE AREA: 6 036.7m 2<br />

AREA: 8,100 m 2<br />

ELECTRICAL ENG<br />

Bokone Reticulatio<br />

and Electrical<br />

LIFT SPECIALIST<br />

Okem Investments<br />

MECHANICAL EN<br />

A R Edwards and A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!