final evaluation report akk_iges_final.pdf - IGES EnviroScope
final evaluation report akk_iges_final.pdf - IGES EnviroScope
final evaluation report akk_iges_final.pdf - IGES EnviroScope
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
AKK-<strong>IGES</strong> New Climate Risk Management Project<br />
2. Seeds distribution among 300 to households<br />
For flood tolerant crop production, the Aman paddy seeds were distributed among 300 household<br />
beneficiaries. The beneficiaries were selected through base line survey and seeds were distributed to<br />
the poorest, marginal farmers, woman headed families, aged, widow and disaster affected families<br />
were the direct beneficiary. After selecting the beneficiaries, the <strong>final</strong> list was shared with Union<br />
Parisad. Union Parisad endorsed the <strong>final</strong> list. The seeds distribution is inaugurated by Union Parisad<br />
Chairman in the presence of the AKK Executive Director.<br />
Figure 8. Left: seeds are being distributed to the beneficiaries; Right: a women inspecting her crop raised<br />
from the distributed seeds.<br />
3. Training on flood and storm warning dissemination<br />
Training on flood and storm early warning and dissemination in community, and flood /cyclone<br />
rescue for CCMC and communities was conducted during 14-15 April 2010. The training was<br />
inaugurated by the Assistant Deputy Commissioner and AKK Executive Director, Program Director,<br />
Water Development Board Executive Engineer were present. WDB executive Engineer was the<br />
resource person of this training. 30 male and female beneficiaries were trained on various aspects of<br />
flood and storm early warning. After the training, CCMC was provided with various logistics so that<br />
the committee can get the early warning and disseminate the same to the community members without<br />
delay.<br />
Steps for early warning dissemination<br />
1. Selection of team members at the ward/community level; 2. Arrangement of training for skill<br />
development of teams; 3. Site selection for local level message dissemination; 4. Form the message<br />
based on locality after receiving message from flood forecast and warning centre; 5. Prepare plans for