06.01.2013 Views

final evaluation report akk_iges_final.pdf - IGES EnviroScope

final evaluation report akk_iges_final.pdf - IGES EnviroScope

final evaluation report akk_iges_final.pdf - IGES EnviroScope

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AKK-<strong>IGES</strong> New Climate Risk Management Project<br />

2. Seeds distribution among 300 to households<br />

For flood tolerant crop production, the Aman paddy seeds were distributed among 300 household<br />

beneficiaries. The beneficiaries were selected through base line survey and seeds were distributed to<br />

the poorest, marginal farmers, woman headed families, aged, widow and disaster affected families<br />

were the direct beneficiary. After selecting the beneficiaries, the <strong>final</strong> list was shared with Union<br />

Parisad. Union Parisad endorsed the <strong>final</strong> list. The seeds distribution is inaugurated by Union Parisad<br />

Chairman in the presence of the AKK Executive Director.<br />

Figure 8. Left: seeds are being distributed to the beneficiaries; Right: a women inspecting her crop raised<br />

from the distributed seeds.<br />

3. Training on flood and storm warning dissemination<br />

Training on flood and storm early warning and dissemination in community, and flood /cyclone<br />

rescue for CCMC and communities was conducted during 14-15 April 2010. The training was<br />

inaugurated by the Assistant Deputy Commissioner and AKK Executive Director, Program Director,<br />

Water Development Board Executive Engineer were present. WDB executive Engineer was the<br />

resource person of this training. 30 male and female beneficiaries were trained on various aspects of<br />

flood and storm early warning. After the training, CCMC was provided with various logistics so that<br />

the committee can get the early warning and disseminate the same to the community members without<br />

delay.<br />

Steps for early warning dissemination<br />

1. Selection of team members at the ward/community level; 2. Arrangement of training for skill<br />

development of teams; 3. Site selection for local level message dissemination; 4. Form the message<br />

based on locality after receiving message from flood forecast and warning centre; 5. Prepare plans for

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!