06.01.2013 Views

Supply Chain Management with APO

Supply Chain Management with APO

Supply Chain Management with APO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

300 15 Detailed Production Planning<br />

15.1.4 Real Quantity<br />

From SAP <strong>APO</strong> 4.0 on the planning mode in the product master determines<br />

whether the requested or the confirmed quantity is used for pegging<br />

and for production planning. Differing from SAP <strong>APO</strong> 3.1 it is therefore<br />

not possible anymore to use the confirmed quantity for pegging and the<br />

requested quantity for production planning.<br />

There are different ideas about the significance of the ATP check for the<br />

planning from company to company. While many companies want the<br />

ATP check to limit the demand signal for production, other companies<br />

think that the ATP check promises to the customer the least he can get and<br />

therefore still want to meet the requested quantity, even when the customer<br />

order is already confirmed <strong>with</strong> less. So therefore they want to plan for the<br />

complete requested quantity. From SAP <strong>APO</strong> 4.0 on it is possible to<br />

choose between these two options on locationproduct level.<br />

15.2 Heuristics for Production Planning<br />

15.2.1 Concept of Production Planning and MRP Heuristic<br />

The production planning in SAP <strong>APO</strong> uses two heuristics – one is controlling<br />

the production planning – i.e. the planned order creation – per<br />

pegging area. A pegging area is a planning segment of a location product,<br />

i.e. there can be more than one planning segments per location product.<br />

The second heuristic is a MRP heuristic that controls the sequence and the<br />

way the production planning heuristic is called.<br />

• Overview of Production Planning Settings<br />

The behaviour of the production planning run is controlled by the settings<br />

for the MRP heuristic, the production planning heuristic and the planning<br />

procedure. Figure 15.2 provides an overview of the settings in the heuristics,<br />

the product master and the global settings.<br />

The planning heuristic is either defined in the MRP heuristic or taken<br />

from the product master. The default setting for the product master is<br />

defined in the global settings <strong>with</strong> the transaction /SAP<strong>APO</strong>/RRPCUST1.<br />

Especially for the area of production planning there are very detailed<br />

consulting notes available which are listed in collective note 441102. The<br />

following chapter is basically a summary and visualisation of the information<br />

in those notes. For more detailed information we recommend to read<br />

the mentioned notes.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!