- Page 2:
Supply Chain Management with APO
- Page 6:
Dr. Jörg Thomas Dickersbach E-mail
- Page 10:
vi Preface scope of this book. Ther
- Page 14:
viii Contents 4.2 Data Structure fo
- Page 18:
x Contents PART IV - DISTRIBUTION 9
- Page 22:
xii Contents 15.2 Heuristics for Pr
- Page 26:
xiv Contents PART VII - CROSS PROCE
- Page 30:
1 SCM Projects with SAP APO 1.1 The
- Page 34:
orders of the partner on the demand
- Page 38:
1.3 SAP APO Project Management and
- Page 42:
2 SCM Processes and SAP APO Modules
- Page 46:
Fig. 2.2. Common time horizons for
- Page 50:
2 SCM Processes and APO Modules 13
- Page 54:
16 3 SAP APO Architecture SAP APO S
- Page 58:
18 3 SAP APO Architecture Most of t
- Page 62:
20 3 SAP APO Architecture • Suppl
- Page 66:
22 3 SAP APO Architecture PP/DS Sin
- Page 70:
24 3 SAP APO Architecture By design
- Page 74:
26 Stock Production Order Fig. 3.10
- Page 78:
28 3 SAP APO Architecture By defaul
- Page 82:
4 Demand Planning 4.1 Demand Planni
- Page 86:
Sales Org XXDE XXDE XXAT XXAT XXCH
- Page 90:
4.2 Data Structure for Demand Plann
- Page 94:
4.2 Data Structure for Demand Plann
- Page 98:
4.2 Data Structure for Demand Plann
- Page 102:
Initial Situation 10 40 30 10 10 20
- Page 106:
Delete Source CVC Add / Overwrite D
- Page 110:
Selection 4.3 Planning Book, Macros
- Page 114:
4.3 Planning Book, Macros and Inter
- Page 118:
4.3 Planning Book, Macros and Inter
- Page 122:
Fig. 4.18. Macro builder 4.3 Planni
- Page 126:
4.3 Planning Book, Macros and Inter
- Page 130:
4.4 Statistical Forecasting 57 The
- Page 134:
4.4 Statistical Forecasting 59 •
- Page 138:
4.4 Statistical Forecasting 61 The
- Page 142:
4.4 Statistical Forecasting 63 assu
- Page 146:
Planning Object Structure Life Cycl
- Page 150:
4.5 Promotion Planning 67 The reduc
- Page 154:
4.5 Promotion Planning 69 • Objec
- Page 158:
Sales Org Product Group Product XXD
- Page 162:
4.6 Dependent Demand in Demand Plan
- Page 166:
Display of Dependent Demand for Inp
- Page 170:
4.8 Background Planning 4.8 Backgro
- Page 174:
4.9 Release of the Demand Plan 79
- Page 178:
4.9 Release of the Demand Plan 81 U
- Page 182:
Logistics Planning Create Demand Pl
- Page 186:
5 Forecast Consumption and Planning
- Page 190:
5.3 Planning with Final Assembly 87
- Page 194:
5.4 Planning Without Final Assembly
- Page 198:
5.5 Planning for Assembly Groups 91
- Page 202:
5.6 Technical Settings for the Requ
- Page 206:
6 Order Fulfilment Overview Order f
- Page 210:
7 Sales 7.1 Sales Order Entry The s
- Page 214:
7.2 Availability Check Overview 101
- Page 218:
Scheduling Agreement in R/3 Schedul
- Page 222:
7.3.2 Basic ATP Configuration 7.3 M
- Page 226:
7.3 Master Data and Configuration 1
- Page 230:
Fig. 7.9. Display of ATP times in l
- Page 234:
Receipt Requirement 70 40 [70] 30 3
- Page 238:
7.4 Product Availability Check 113
- Page 242:
7.5 Allocations 115 are used for a
- Page 246:
Table /SAPAPO/KOMGO Field Catalogue
- Page 250:
7.5 Allocations 119 allowed for bac
- Page 254:
7.5.4 Collective Product Allocation
- Page 258:
• a calculation profile and • a
- Page 262:
7.7 Rules-Based ATP 125 2. The sale
- Page 266:
Products P1 P2 P3 LOC1 Locations LO
- Page 270:
User Specific Configuration, e.g. S
- Page 274:
7.7 Rules-Based ATP 131 • Exclusi
- Page 278:
7.8 Transportation and Shipment Sch
- Page 282:
7.9 Backorder Processing 135 There
- Page 286:
7.9 Backorder Processing 137 • Re
- Page 290:
BOP With New Distribution, Check of
- Page 294:
7.9 Backorder Processing 141 the re
- Page 298:
7.9 Backorder Processing 143 • Or
- Page 302:
146 8 Transportation Planning Subse
- Page 306:
148 8 Transportation Planning The t
- Page 310:
150 8 Transportation Planning • V
- Page 314:
152 8 Transportation Planning • T
- Page 318:
154 8 Transportation Planning 8.2.3
- Page 322:
156 8 Transportation Planning 8.4 T
- Page 326:
158 8 Transportation Planning Fig.
- Page 330:
160 8 Transportation Planning If th
- Page 334:
162 8 Transportation Planning Fig.
- Page 338:
166 9 Distribution and Supply Chain
- Page 342:
168 9 Distribution and Supply Chain
- Page 346:
170 9 Distribution and Supply Chain
- Page 350:
172 9 Distribution and Supply Chain
- Page 354:
174 9 Distribution and Supply Chain
- Page 358:
176 9 Distribution and Supply Chain
- Page 362:
178 9 Distribution and Supply Chain
- Page 366:
180 9 Distribution and Supply Chain
- Page 370:
10 Integrated Distribution and Prod
- Page 374:
10.2 SNP Optimiser 185 Min { ΣProd
- Page 378:
10.2.3 Costs and Constraints 10.2 S
- Page 382:
10.2 SNP Optimiser 189 The quota fo
- Page 386:
10.2 SNP Optimiser 191 the PDS resp
- Page 390:
10.3 Capable-to-Match 193 and the m
- Page 394:
10.3 Capable-to-Match 195 • Maste
- Page 398:
10.3 Capable-to-Match 197 • Searc
- Page 402:
10.3 Capable-to-Match 199 a single
- Page 406:
10.3 Capable-to-Match 201 • Limit
- Page 410:
10.3 Capable-to-Match 203 The deman
- Page 414:
10.3 Capable-to-Match 205 • Store
- Page 418:
11 Distribution Planning 11.1 Maste
- Page 422:
11.1 Master Data for Distribution P
- Page 426:
Demand Default Planned Distribution
- Page 430:
Fig. 11.6. Order flow for stock in
- Page 434:
11.6 Sourcing 11.6 Sourcing 215 In
- Page 438:
12 Replenishment 12.1 Deployment 12
- Page 442:
12.1 Deployment 219 ments (ATD-issu
- Page 446:
Target Location Stock Planned Order
- Page 450:
12.1 Deployment 223 demands of the
- Page 454:
12.1 Deployment 225 modelled by inc
- Page 458:
12.2 Transport Load Builder 227 Dep
- Page 462:
Straight Loading? No Load Balancing
- Page 466:
12.2 Transport Load Builder 231 wei
- Page 470:
13 Production Overview 13.1 Product
- Page 474:
13.1 Production Process Overview 23
- Page 478:
Fig. 13.2. Order cycle for producti
- Page 482:
Plan Property Bucket - Finite Infin
- Page 486:
DP SNP Heuristic SNP Optimisation C
- Page 490:
Property SNP Heuristic SNP Optimise
- Page 494:
13.2.3 Scrap 247 Depending on the p
- Page 498:
249 Fix Lot Size APO = Fix lot Size
- Page 502:
251 is strongly recommended to use
- Page 506:
13.4 Master Data for Production 253
- Page 510:
DP SNP PP/DS SAP ERP DP - PPM SNP -
- Page 514:
257 The entry for the utilisation i
- Page 518:
Activity Operation Scrap Component
- Page 522:
Table 13.8. Properties of the SNP-P
- Page 526:
Variant Variant # Start Date / End
- Page 530:
265 The time buffer causes the oper
- Page 534:
267 • Resource Integration Unless
- Page 538:
269 • For bucket resources: the v
- Page 542:
Operation Activity Components/ Mode
- Page 546:
273 • Secondary Resources If a wo
- Page 550: 13.5 Dependencies to the SAP ERP Co
- Page 554: 14 Rough-Cut Production Planning 14
- Page 558: Fig. 14.2. Capacity view 279 As det
- Page 562: 281 The PDS resp. PPM for the plann
- Page 566: 14.4 SNP Optimisation for Productio
- Page 570: 14.5 Capable-to-Match (with SNP Mas
- Page 574: BOM-Level Total Demand Planned Prod
- Page 578: BOM-Level Fig. 14.12. Scheduling in
- Page 582: 14.7 Integration to PP/DS and SAP E
- Page 586: 14.7 Integration to PP/DS and SAP E
- Page 590: 15 Detailed Production Planning 15.
- Page 594: Table 15.3. PP/DS categories (extra
- Page 598: 15.1 Basics of PP/DS 299 In the int
- Page 604: 302 15 Detailed Production Planning
- Page 608: 304 15 Detailed Production Planning
- Page 612: 306 15 Detailed Production Planning
- Page 616: 308 15 Detailed Production Planning
- Page 620: 310 15 Detailed Production Planning
- Page 624: 312 15 Detailed Production Planning
- Page 628: 314 15 Detailed Production Planning
- Page 632: 316 15 Detailed Production Planning
- Page 636: 318 15 Detailed Production Planning
- Page 640: 320 15 Detailed Production Planning
- Page 644: 322 15 Detailed Production Planning
- Page 648: 16 Sales in a Make-to-Order Environ
- Page 652:
This recommendation is resulting fr
- Page 656:
329 If CTP is used in a make-to-sto
- Page 660:
16.2 Capable-to-Promise 331 and the
- Page 664:
16.2 Capable-to-Promise 333 The siz
- Page 668:
16.2 Capable-to-Promise 335 • Sub
- Page 672:
16.3 Multi-level ATP 337 from SAP E
- Page 676:
16.3 Multi-level ATP 339 • Check
- Page 680:
342 17 Detailed Scheduling In the r
- Page 684:
344 17 Detailed Scheduling • Plan
- Page 688:
346 17 Detailed Scheduling displaye
- Page 692:
348 17 Detailed Scheduling Resource
- Page 696:
350 17 Detailed Scheduling ristic p
- Page 700:
352 17 Detailed Scheduling • Mult
- Page 704:
354 17 Detailed Scheduling products
- Page 708:
356 17 Detailed Scheduling APO and
- Page 712:
358 17 Detailed Scheduling Model Ge
- Page 716:
360 17 Detailed Scheduling • the
- Page 720:
362 17 Detailed Scheduling whether
- Page 724:
364 17 Detailed Scheduling Without
- Page 728:
366 17 Detailed Scheduling • Volu
- Page 732:
368 18 Production Execution Trigger
- Page 736:
370 18 Production Execution or at t
- Page 740:
372 18 Production Execution Operati
- Page 744:
374 19 Modelling of Special Product
- Page 748:
376 19 Modelling of Special Product
- Page 752:
378 19 Modelling of Special Product
- Page 756:
380 19 Modelling of Special Product
- Page 760:
382 19 Modelling of Special Product
- Page 764:
20 Purchasing 20.1 Purchasing Overv
- Page 768:
20.1 Purchasing Overview 389 The tr
- Page 772:
20.2 Suppliers and Procurement Rela
- Page 776:
20.3 Supplier Selection 393 (in thi
- Page 780:
20.4 Scheduling Agreements 395 The
- Page 784:
20.5 Supplier Capacity 397 planning
- Page 788:
20.5 Supplier Capacity 399 not suit
- Page 792:
402 21 Subcontracting Therefore the
- Page 796:
404 21 Subcontracting • Order Str
- Page 800:
406 21 Subcontracting The advantage
- Page 804:
408 21 Subcontracting Note 379006 d
- Page 808:
410 21 Subcontracting Fig. 21.12. P
- Page 812:
22 Stock and Safety Stock 22.1 Stoc
- Page 816:
22.2 Safety Stock 417 The determina
- Page 820:
22.2 Safety Stock 419 is that the c
- Page 824:
422 23 Interchangeability • Inter
- Page 828:
424 23 Interchangeability • Distr
- Page 832:
426 23 Interchangeability Fig. 23.5
- Page 836:
428 24 Exception Reporting User Ale
- Page 840:
430 24 Exception Reporting calculat
- Page 844:
432 24 Exception Reporting 24.8 the
- Page 848:
434 24 Exception Reporting Check/ U
- Page 852:
436 24 Exception Reporting Drag & D
- Page 856:
440 25 Core Interface • System Co
- Page 860:
442 25 Core Interface The transacti
- Page 864:
444 25 Core Interface The transfer
- Page 868:
446 25 Core Interface 25.4 Master D
- Page 872:
448 25 Core Interface fields offer
- Page 876:
450 25 Core Interface Another worka
- Page 880:
452 25 Core Interface These setting
- Page 884:
454 25 Core Interface models for th
- Page 888:
456 25 Core Interface • Queue Nam
- Page 892:
458 25 Core Interface APO system an
- Page 896:
26 Integration to DP 26.1 Data Stor
- Page 900:
26.2 Data Loading Structures 463 co
- Page 904:
Fig. 26.6. Transfer rules 26.2 Data
- Page 908:
Fig. 26.8. Connecting R/3 info stru
- Page 912:
Appendix
- Page 916:
472 References 198852 Performance:
- Page 920:
474 References 435160 Finite/infini
- Page 924:
476 References 519014 Handling Plan
- Page 928:
Abbreviations ALE Application Link
- Page 932:
Transactions and Reports For the qu
- Page 936:
Forecast Consumption Transactions a
- Page 940:
Distribution and Supply Chain Plann
- Page 944:
Transactions and Reports 487 SAP AP
- Page 948:
Modelling of Special Production Con
- Page 952:
Transactions and Reports 491 SAP ER
- Page 956:
Transactions and Reports 493 SAP ER
- Page 960:
Index Access Strategy 125 Administr
- Page 964:
Forecast Profile 63 Forecast Segmen
- Page 968:
Production Order 296, 425 f. Produc
- Page 972:
Transportation Group 152 Transporta