09.01.2013 Views

1.2 Structure of the Planning and installation guide - Shop

1.2 Structure of the Planning and installation guide - Shop

1.2 Structure of the Planning and installation guide - Shop

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.4 Duty to inform<br />

Reading <strong>the</strong> <strong>Planning</strong> <strong>and</strong><br />

<strong>installation</strong> <strong>guide</strong><br />

2 Safety notes – Duty to inform<br />

Everyone who works on <strong>the</strong> system must have read <strong>the</strong> <strong>Planning</strong> <strong>and</strong><br />

<strong>installation</strong> <strong>guide</strong> before starting work <strong>and</strong>, in particular, have read<br />

<strong>the</strong> chapter “2 Safety notes”.<br />

This holds especially true for persons who only occasionally work on<br />

<strong>the</strong> system, e.g. when cleaning or maintaining <strong>the</strong> heating system.<br />

This <strong>Planning</strong> <strong>and</strong> <strong>installation</strong> <strong>guide</strong> must be kept easily accessible<br />

at <strong>the</strong> heating system's <strong>installation</strong> location.<br />

© HDG Bavaria GmbH 06/2008 HDG Navora 20/25/30 with HDG Lambda Control 1 - V 2 - en<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!