1<br />

3 <strong>Planning</strong> <strong>the</strong> HDG Navora – Structural requirements<br />

Space <strong>and</strong> dimensional requirements<br />

B<br />

A<br />

Figure 3/6 - Space <strong>and</strong> dimensional requirements<br />

1 Boiler room<br />

A) Min. 300 mm<br />

B) Min. 200 mm (or 800 mm)<br />

C) Min. 800 mm (or 200 mm)- One side must have at least 800 mm<br />

to allow access for cleaning.<br />

D) 1.300 mm - One side must have at least 800 mm to allow access<br />

for cleaning.<br />

E) 1700 mm<br />

F) Min. 2.800 mm<br />

G) Min. 1.350 mm<br />

Room height Minimum required room height 1.950 mm, recommended 2.300<br />

mm.<br />

required for <strong>installation</strong> Clearance dimensions: .1600 mm x 700 mm<br />

G<br />

© HDG Bavaria GmbH 06/2008 HDG Navora 20/25/30 with HDG Lambda Control 1 - V 2 - en<br />

C<br />

D<br />

E<br />

F<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!