09.01.2013 Views

1.2 Structure of the Planning and installation guide - Shop

1.2 Structure of the Planning and installation guide - Shop

1.2 Structure of the Planning and installation guide - Shop

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.4 Dimensions<br />

A<br />

I<br />

H<br />

G<br />

Rear <strong>and</strong> side views<br />

B<br />

Figure 3/5 - Side <strong>and</strong> rear views<br />

3 <strong>Planning</strong> <strong>the</strong> HDG Navora – Dimensions<br />

A) Height to centre <strong>of</strong> flow connection 1405 mm<br />

B) Boiler height 1532 mm<br />

C) Flue pipe connection Ø 150 mm<br />

D) Flue gas blower protrudes 191 mm<br />

E) Boiler length 1031 mm<br />

F) Overall length with filling hatch open 1677 mm<br />

G) Height <strong>of</strong> flue pipe connection 900 mm<br />

H) Height to centre <strong>of</strong> return connection 382 mm<br />

I) Boiler width 634 mm (without connection threads on safety heat<br />

exchanger)<br />

© HDG Bavaria GmbH 06/2008 HDG Navora 20/25/30 with HDG Lambda Control 1 - V 2 - en<br />

F<br />

E<br />

D<br />

C<br />

21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!