09.01.2013 Views

1.2 Structure of the Planning and installation guide - Shop

1.2 Structure of the Planning and installation guide - Shop

1.2 Structure of the Planning and installation guide - Shop

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16<br />

17<br />

1<br />

16<br />

17<br />

15<br />

14<br />

13<br />

3<br />

2<br />

12<br />

4<br />

10<br />

9<br />

3 <strong>Planning</strong> <strong>the</strong> HDG Navora – Hydraulic connection<br />

Figure 3/12 - Example 2: HDG hydraulic system 3.1<br />

1 Refill signal H1<br />

2 Boiler sensor KF<br />

3 Prewired contactor ÖKU 3.1<br />

4 Heating circuit <strong>and</strong> hot water control<br />

5 Outdoor sensor AF<br />

6 Hot water tank sensor BRF<br />

7 Hot water tank<br />

8 Boiler sensor 1 KF1<br />

9 Oil or gas boiler (condensing boiler)<br />

10 Pump condensing boiler<br />

11 Low loss header<br />

12 Change-over valve Y3<br />

13 Accumulator (buffer)<br />

14 Accumulator sensor SF<br />

15 Buffer charging valve Y2<br />

16 HDG Lambda Control 1<br />

17 HDG Navora 20/25/30 with HDG Lambda Control 1<br />

18 Primary pump M1<br />

19 Return valve Y1<br />

© HDG Bavaria GmbH 06/2008 HDG Navora 20/25/30 with HDG Lambda Control 1 - V 2 - en<br />

11<br />

8<br />

7<br />

5<br />

6<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!