11.01.2013 Views

Download - Moffatt and Nichol Engineers

Download - Moffatt and Nichol Engineers

Download - Moffatt and Nichol Engineers

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Port of Los Angeles Berth 408 Crude Oil Import Terminal Design<br />

Owner: Plains All American<br />

Pipeline, L.P.<br />

Location<br />

Los Angeles, California<br />

The client is developing a portion of Pier 400 as a crude oil import terminal, the first to be built in California in 30<br />

years <strong>and</strong> the only one of its kind on the West Coast to accommodate fully laden, very large crude carriers (VLCCs).<br />

As the designer of record for the marine structures, <strong>Moffatt</strong> & <strong>Nichol</strong> is leading all aspects of the design, including the<br />

coastal engineering services to identify the environmental loadings; mooring & berthing analysis; navigation & berth<br />

utilization studies; marine structures design; <strong>and</strong> ancillary structures to accommodate a fire water pump system <strong>and</strong> two<br />

work boats. As the designer of record for the topside facilities, <strong>Moffatt</strong> & <strong>Nichol</strong> is also leading all aspects of the mechanical;<br />

electrical; <strong>and</strong> piping design. In addition to design services, M&N is providing equipment procurement for all<br />

of the specialty equipment for this major facility, including a gangway tower, fender systems, quick release hooks, <strong>and</strong><br />

environmental monitoring systems. The firm also conducted a graphics-rich public outreach campaign.<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!