<strong>RIIO</strong>-<strong>T1</strong> <strong>and</strong> <strong>GD1</strong>: <strong>Draft</strong> <strong>licence</strong> <strong>conditions</strong> <strong>–</strong> <strong>First</strong> <strong>informal</strong> <strong>licence</strong> drafting<br />
consultation<br />
2.43. The effect of the above is to ensure the continuity of the TIRG funding<br />
mechanism during <strong>RIIO</strong> <strong>and</strong> we do not expect the changes to materially alter the<br />
existing TIRG <strong>licence</strong> condition <strong>and</strong> its purpose.<br />
2.44. As part of discussions with the network companies we identified the ATIRG<br />
term, which forms part of the TIRG revenue formula, <strong>and</strong> its role during the postincentive<br />
period shadow- RAV to RAV transfer.<br />
2.45. We will consider the transfer methodology in more detail in due course.<br />
However, at this time, we consider that the existing <strong>licence</strong> provisions would not<br />
automatically allow for the update of the transfer value in line with the approved<br />
income <strong>and</strong> asset value adjusting events.<br />
2.46. We propose to amend the TIRG condition accordingly to facilitate transfer of<br />
approved adjusting events as part of RAV transfer process. We intend to consult<br />
specifically on TIRG shortly.<br />
2.47. It should be noted that we are not currently proposing any changes to the<br />
associated Annex or Schedule. 24<br />
Special Condition D4 (J4 for SPTL <strong>and</strong> SHETL): Pass Through Items [ETC 21]<br />
<strong>Draft</strong>ing status: Current working draft provided in Supporting Document 1.<br />
2.48. Our proposed changes to this condition for ET are in line with our proposed<br />
changes to similar provisions for GT <strong>and</strong> GD. We have therefore outlined our<br />
proposed changes to these common <strong>conditions</strong> in chapter 7. 25<br />
Special Condition D5 (J5 for SPTL <strong>and</strong> SHETL): Incentive Payments [ETC 23]<br />
<strong>Draft</strong>ing status: Proposal to delete.<br />
2.49. We propose to delete this condition as provisions <strong>and</strong> terms within it have<br />
either been moved to other parts of the <strong>licence</strong> or can be removed as superfluous.<br />
2.50. The provisions relating to efficiently mitigating the leakage of sulphur<br />
hexafluoride are now contained within ETC25: Incentive to Reduce Sulphur<br />
Hexafluoride Emissions 26 <strong>and</strong> provisions with respect to energy not supplied will be<br />
contained within ETC2: Reliability Incentive Adjust ment in Respect of Energy Not<br />
Supplied. 27<br />
24 Annex to SpC D3 (NGET) <strong>and</strong> Schedule C to J3 for both SPTL <strong>and</strong> SHETL).<br />
25 Chapter 7: [GDC/ETC/GTC 21].Allowed pass through items<br />
26 See ETC 25: Incentive to Reduce Sulphur Hexafluoride Emissions below for further details.<br />
27 See ETC 2: Incentive Adjustment in Respect of Energy Not Supplied below for further details.