<strong>RIIO</strong>-<strong>T1</strong> <strong>and</strong> <strong>GD1</strong>: <strong>Draft</strong> <strong>licence</strong> <strong>conditions</strong> <strong>–</strong> <strong>First</strong> <strong>informal</strong> <strong>licence</strong> drafting<br />
consultation<br />
ETC 17: Environmental Discretionary Reward Scheme<br />
<strong>Draft</strong>ing status: Current working draft provided in Supporting Document 1.<br />
2.88. The purpose of this proposed new condition is to establish arrangements for<br />
the Environmental Discretionary Reward (EDR) Scheme, <strong>and</strong> to determine the<br />
amount of incentive the Licensee shall receive in relation to its performance.<br />
2.89. As part of <strong>RIIO</strong> we have consulted on introducing EDR Scheme to encourage<br />
the Licensee to achieve high st<strong>and</strong>ards in environmental management as well as<br />
facilitate the industry to move towards a low carbon energy system.<br />
2.90. The effect of this condition is to make a positive adjust ment to the Licensee‟s<br />
revenue if they meet the performance criteria set by the EDR Scheme. For further<br />
information on the EDR Scheme Guidance, which will cover the performance<br />
categories, criteria as well as arrangements relating to administration, governance<br />
<strong>and</strong> revision of the EDR Scheme please see chapter 8. 41<br />
2.91. Further work is required ahead of the Second Consultation to develop the EDR<br />
Scheme guidance document in further detail.<br />
ETC 18: Enhancement to Pre-existing Infrastructure in National Parks <strong>and</strong><br />
Areas of Outst<strong>and</strong>ing Natural Beauty<br />
<strong>Draft</strong>ing status: Current working draft provided in Supporting Document 1.<br />
2.92. The purpose of this proposed new condition is to specify visual amenity<br />
outputs the Licensee will be required to deliver in relation to existing transmission<br />
infrastructure in National Parks <strong>and</strong> Areas of Outst<strong>and</strong>ing Natural Beauty. The<br />
condition also establishes provisions for the Authority to determine the amount of<br />
allowed expenditure the Licensee shall incur in the delivery of such outputs as a<br />
PCFM 42 Variable Value into the PCFM.<br />
2.93. The effect of this condition is to enable the Licensee to request the Authority<br />
to determine the allowed expenditure in relation to specific visual amenity outputs in<br />
designated areas.<br />
41 Chapter 8: Environmental Discretionary Reward (EDR) Scheme Guidance .<br />
42 Further details on the PCFM can be found in chapter 6: The Annual Iteration Process for the Price<br />