28<br />

<strong>RIIO</strong>-<strong>T1</strong> <strong>and</strong> <strong>GD1</strong>: <strong>Draft</strong> <strong>licence</strong> <strong>conditions</strong> <strong>–</strong> <strong>First</strong> <strong>informal</strong> <strong>licence</strong> drafting<br />

consultation<br />

2.68. Our intention is not to alter the broad purpose of the existing condition.<br />

2.69. The purpose of this new draft condition (replacing Part 2 (ii) of SpC AA5A) is<br />

to provide for the funding of the baseline revenue that we propose to allow for the<br />

System Operator internal costs. This is the capital expenditure that enables the SO<br />

to carry out its role in operating the system. This condition brings together the<br />

elements of SO internal allowed revenue calculated in other <strong>licence</strong> <strong>conditions</strong>.<br />

Therefore, there may be a need to add in/remove terms once other <strong>licence</strong><br />

<strong>conditions</strong> are finalised.<br />

2.70. The new specific SO external cost condition (ETC 127) will be developed as<br />

part of the review of external SO incentives for 2013.<br />

Table 2.2: Proposed new structure of SpC AA5A under <strong>RIIO</strong><br />

Existing condition<br />

Proposed new structure In conjunction<br />

reference<br />

with<br />

Part 1 Remove <strong>–</strong> no substantive reason to<br />

retain.<br />

<strong>RIIO</strong>-<strong>T1</strong><br />

Part 2 (i) <strong>–</strong> SO external costs Propose to introduce a separate SO 2013<br />

condition<br />

(ETC127).<br />

for SO external costs<br />

33<br />

Part 2 (ii) <strong>–</strong> SO internal costs Remains within this <strong>licence</strong> condition<br />

(ETC12 ) with the existing income<br />

adjusting event term (IAT) being<br />

moved to a specific condition ETC117:<br />

Arrangements for the recovery of SO<br />

uncertain costs<br />

<strong>RIIO</strong>-<strong>T1</strong><br />

Part 2 (iii) Information on Move the data reporting requirements <strong>RIIO</strong>-<strong>T1</strong>/SO 2013<br />

balancing services<br />

into the RIGs <strong>and</strong> then remove from<br />

face of the <strong>licence</strong>.<br />

Part 2 (iv) TO incentives Incorporate within the created SO<br />

external costs condition along with<br />

definition of „ON‟ <strong>and</strong> „IONT‟ from Part<br />

2 (ii).<br />

SO 2013<br />

Special Condition AA5C: Information to be Provided to the Authority in<br />

Connection with the Transmission Network Revenue Restriction (NGET), <strong>and</strong><br />

Special Condition L2: Transmission losses reporting (SPTL <strong>and</strong> SHETL)<br />

[ETC45]<br />

<strong>Draft</strong>ing status: Proposal to remove <strong>and</strong> be replaced by ETC45:Transmission losses.<br />

Current working draft provided in Supporting Document 1.<br />

2.71. The purpose of this condition is to set requirements for the Licensee to report<br />

to stakeholders annually in relation to transmission losses on the Licensee‟s<br />

transmission system <strong>and</strong> the steps the Licensee is taking to contribute to a lower<br />

level of transmission losses on the Licensee‟s transmission system.<br />

33 System Operator incentive schemes from 2013: Initial Proposals