RIIO-T1 and GD1: Draft licence conditions – First informal ... - Ofgem
RIIO-T1 and GD1: Draft licence conditions – First informal ... - Ofgem
RIIO-T1 and GD1: Draft licence conditions – First informal ... - Ofgem
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
28<br />
<strong>RIIO</strong>-<strong>T1</strong> <strong>and</strong> <strong>GD1</strong>: <strong>Draft</strong> <strong>licence</strong> <strong>conditions</strong> <strong>–</strong> <strong>First</strong> <strong>informal</strong> <strong>licence</strong> drafting<br />
consultation<br />
2.68. Our intention is not to alter the broad purpose of the existing condition.<br />
2.69. The purpose of this new draft condition (replacing Part 2 (ii) of SpC AA5A) is<br />
to provide for the funding of the baseline revenue that we propose to allow for the<br />
System Operator internal costs. This is the capital expenditure that enables the SO<br />
to carry out its role in operating the system. This condition brings together the<br />
elements of SO internal allowed revenue calculated in other <strong>licence</strong> <strong>conditions</strong>.<br />
Therefore, there may be a need to add in/remove terms once other <strong>licence</strong><br />
<strong>conditions</strong> are finalised.<br />
2.70. The new specific SO external cost condition (ETC 127) will be developed as<br />
part of the review of external SO incentives for 2013.<br />
Table 2.2: Proposed new structure of SpC AA5A under <strong>RIIO</strong><br />
Existing condition<br />
Proposed new structure In conjunction<br />
reference<br />
with<br />
Part 1 Remove <strong>–</strong> no substantive reason to<br />
retain.<br />
<strong>RIIO</strong>-<strong>T1</strong><br />
Part 2 (i) <strong>–</strong> SO external costs Propose to introduce a separate SO 2013<br />
condition<br />
(ETC127).<br />
for SO external costs<br />
33<br />
Part 2 (ii) <strong>–</strong> SO internal costs Remains within this <strong>licence</strong> condition<br />
(ETC12 ) with the existing income<br />
adjusting event term (IAT) being<br />
moved to a specific condition ETC117:<br />
Arrangements for the recovery of SO<br />
uncertain costs<br />
<strong>RIIO</strong>-<strong>T1</strong><br />
Part 2 (iii) Information on Move the data reporting requirements <strong>RIIO</strong>-<strong>T1</strong>/SO 2013<br />
balancing services<br />
into the RIGs <strong>and</strong> then remove from<br />
face of the <strong>licence</strong>.<br />
Part 2 (iv) TO incentives Incorporate within the created SO<br />
external costs condition along with<br />
definition of „ON‟ <strong>and</strong> „IONT‟ from Part<br />
2 (ii).<br />
SO 2013<br />
Special Condition AA5C: Information to be Provided to the Authority in<br />
Connection with the Transmission Network Revenue Restriction (NGET), <strong>and</strong><br />
Special Condition L2: Transmission losses reporting (SPTL <strong>and</strong> SHETL)<br />
[ETC45]<br />
<strong>Draft</strong>ing status: Proposal to remove <strong>and</strong> be replaced by ETC45:Transmission losses.<br />
Current working draft provided in Supporting Document 1.<br />
2.71. The purpose of this condition is to set requirements for the Licensee to report<br />
to stakeholders annually in relation to transmission losses on the Licensee‟s<br />
transmission system <strong>and</strong> the steps the Licensee is taking to contribute to a lower<br />
level of transmission losses on the Licensee‟s transmission system.<br />
33 System Operator incentive schemes from 2013: Initial Proposals