ESONET Contract no.036851/<strong><strong>Period</strong>ic</strong> <strong>Activity</strong> <strong>Report</strong>/3 rd <strong>Period</strong><br />

Task 2c) – Underwater intervention<br />

<strong>Activity</strong> 2c1: From concepts to operations: feedback on underwater intervention<br />

procedures<br />

During the deployment of the LOOME observatory, the UniHB implemented the<br />

recommended practices and reported their experience to the task leader. This process is<br />

necessary to make progress in the simulation of underwater manipulations. A report for the<br />

LOOME DM summarises the deployment procedure. Some procedures were already provided<br />

by other demonstration missions participants during the second period.<br />

<strong>Activity</strong> 2c2: Development of Best Practices from simulation procedures<br />

Simulation facilities to train pilots for observatory maintenance procedures are currently<br />

under construction at IFREMER and KDM-UniHB. Although commercial systems are<br />

available, they do not provide the flexibility that is needed for simulating scientific<br />

operations. Both partners are working closely together to tackle particular issues such as<br />

simulating the plugging process for underwater connectors.<br />

Deliverable report D51, under the responsibility of IFREMER, is scheduled to be completed<br />

later than foreseen due to important health problem of the main responsible. Only a draft is<br />

provided now to present the status of the work done. The final version is postponed to<br />

September 2010..<br />

Task 2d) - Sharing testing facilities<br />

<strong>Activity</strong> 2d1: Practical implementation of device testing concepts<br />

This activity focuses on promoting discussion and exchanges of information between<br />

ESONET Partners on<br />

- existing testing facilities: on land, in coastal water areas or deep-sea sites;<br />

- functional and environmental test procedures of equipment;<br />

- calibration of sensors and measuring systems.<br />

The final objective is to attain shared use of Partner facilities and to draw up an agreed set of<br />

testing and calibration procedures for common use by the ESONET community.<br />

During the previous ESONET <strong>Period</strong>s, ESONET Partners were requested to provide<br />

information on their existing testing facilities and the test and calibration procedures that they<br />

use; this information is to be compiled and made available to ESONET members. A<br />

collaborative BSCW space was opened to register gathered information and to be a proposal<br />

and discussion forum.<br />

During the last quarter of 2009, the content of this collaborative space was transferred to the<br />

“ESONET Partners only” web pages, with help of ESONET Partner ALTRAN/ATLANTIDE<br />

http://www.esonetnoe.org/partners_only/work_package_space/wp2_standardization_and_interoperability<br />

The structure of the database is as follows:<br />

0- Notes on database set-up process and organisation of information<br />

1- Infrastructures and facilities<br />

1.1- Land-based Laboratory Facilities<br />

1.1.1- Environmental or operational testing facilities<br />

1.1.5- Sensor and measuring system calibration facilities<br />

April 2010 28