Periodic Activity Report/3rd Period - Ifremer
Periodic Activity Report/3rd Period - Ifremer
Periodic Activity Report/3rd Period - Ifremer
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ESONET Contract no.036851/<strong><strong>Period</strong>ic</strong> <strong>Activity</strong> <strong>Report</strong>/3 rd <strong>Period</strong><br />
Task 2c) – Underwater intervention<br />
<strong>Activity</strong> 2c1: From concepts to operations: feedback on underwater intervention<br />
procedures<br />
During the deployment of the LOOME observatory, the UniHB implemented the<br />
recommended practices and reported their experience to the task leader. This process is<br />
necessary to make progress in the simulation of underwater manipulations. A report for the<br />
LOOME DM summarises the deployment procedure. Some procedures were already provided<br />
by other demonstration missions participants during the second period.<br />
<strong>Activity</strong> 2c2: Development of Best Practices from simulation procedures<br />
Simulation facilities to train pilots for observatory maintenance procedures are currently<br />
under construction at IFREMER and KDM-UniHB. Although commercial systems are<br />
available, they do not provide the flexibility that is needed for simulating scientific<br />
operations. Both partners are working closely together to tackle particular issues such as<br />
simulating the plugging process for underwater connectors.<br />
Deliverable report D51, under the responsibility of IFREMER, is scheduled to be completed<br />
later than foreseen due to important health problem of the main responsible. Only a draft is<br />
provided now to present the status of the work done. The final version is postponed to<br />
September 2010..<br />
Task 2d) - Sharing testing facilities<br />
<strong>Activity</strong> 2d1: Practical implementation of device testing concepts<br />
This activity focuses on promoting discussion and exchanges of information between<br />
ESONET Partners on<br />
- existing testing facilities: on land, in coastal water areas or deep-sea sites;<br />
- functional and environmental test procedures of equipment;<br />
- calibration of sensors and measuring systems.<br />
The final objective is to attain shared use of Partner facilities and to draw up an agreed set of<br />
testing and calibration procedures for common use by the ESONET community.<br />
During the previous ESONET <strong>Period</strong>s, ESONET Partners were requested to provide<br />
information on their existing testing facilities and the test and calibration procedures that they<br />
use; this information is to be compiled and made available to ESONET members. A<br />
collaborative BSCW space was opened to register gathered information and to be a proposal<br />
and discussion forum.<br />
During the last quarter of 2009, the content of this collaborative space was transferred to the<br />
“ESONET Partners only” web pages, with help of ESONET Partner ALTRAN/ATLANTIDE<br />
http://www.esonetnoe.org/partners_only/work_package_space/wp2_standardization_and_interoperability<br />
The structure of the database is as follows:<br />
0- Notes on database set-up process and organisation of information<br />
1- Infrastructures and facilities<br />
1.1- Land-based Laboratory Facilities<br />
1.1.1- Environmental or operational testing facilities<br />
1.1.5- Sensor and measuring system calibration facilities<br />
April 2010 28