ESONET Contract no.036851/<strong><strong>Period</strong>ic</strong> <strong>Activity</strong> <strong>Report</strong>/3 rd <strong>Period</strong><br />

The MODOO DM mainly addressed outlying and building hardware, in particular the Data<br />

Collection and Dissemination (DCD) node to be connected to the MODOO lander and<br />

mooring. This is in view of the deployment and the recovery cruise in the Porcupine Abyssal<br />

Plain off southwest Ireland scheduled for May/June 2010.<br />

The MOMAR-D is proceeding with the final definition of the observatory and the start the<br />

technological work: designing and building the sensors/nodes, adapting sensor software to<br />

SEAMON technology. The objective is to start trials in Brest by Spring 2010. The cruise to<br />

implement the observatory infrastructure on Lucky Strike (Azores), is now scheduled for<br />

September 2010 (R/V Pourquoi pas? and ROV Victor 6000).<br />

The AOEM (ESONET Arctic site), for which the Grant Agreement and Implementation Plan<br />

had to be amended, commenced in July 2009 with the preparation of the geophysical<br />

experiments for assessing the variability of the acoustic signature of the bubble plumes in the<br />

water column, monitoring the thermal signal of fluids expelled from the sediment and<br />

determining the micro-seismological expression of hydrate dissociation and fluid escape. The<br />

technical work that has started includes the identification of available technical solutions for<br />

data transfer from Fram Strait moorings to land and of feasible ocean water column<br />

deliverables that can be collected from the cabled network and meet the requirements of user<br />

community.<br />

2.4.3 Deviations from the project work programme, and corrective actions taken<br />

3. Delay in the signature of the AOEM DM Grant Agreement (2 nd Call). The delay was<br />

due to the planned participation of an institution which is not an ESONET consortium<br />

Partner. This Sub-contracting was not provided for ESONET, so the ESONET<br />

Coordinator prepared a request of contract amendment including modifications of<br />

financial information. This amendment request took a longer time than expected. .<br />

4. The delivery of Marmara-DM semester report was delayed for about 3 months. This<br />

was in part due to the overlap of the report deadline with the preparation and<br />

subsequent development of sea operations in the Sea of Marmara, which involved all<br />

the Partners of the DM. This kind of delay may be recurrent at this stage (at-sea<br />

operations) and are difficult to overcome given the large number of partners involved<br />

in DM reporting. Repeated solicitations and reminders with warnings of cutting off<br />

DM funds to Partners may be necessary to achieve punctual reporting.<br />

Note from the coordinator: the deliverable D45b is not delivered yet due to the delay of the<br />

deliverable D45a.<br />

Del.<br />

no.<br />

D45a<br />

2.4.4 Deliverables list<br />

Deliverable<br />

name<br />

Second<br />

periodical report<br />

WP<br />

no.<br />

Date<br />

due<br />

Actual/Forecasted<br />

delivery date<br />

Estimated<br />

indicative<br />

personmonths<br />

(*)<br />

Used<br />

indicative<br />

personmonths<br />

(*)<br />

Lead<br />

contractor<br />

WP4 28 31 278.5 INGV<br />

April 2010 40