ESONET Contract no.036851/<strong><strong>Period</strong>ic</strong> <strong>Activity</strong> <strong>Report</strong>/3 rd <strong>Period</strong><br />

to round out planning in demonstration missions (DMs) and have (or will) include workshops<br />

for Celtnet/Porcupine and Ligurian nodes. In addition, a new section focusing on acoustic<br />

observatory modules and objectives is being prepared. This is being led by FORTH. NERSC,<br />

CINTAL, and ULB. The specific topics include the role of sound in the observation of the<br />

ocean, inverse problems in underwater acoustics related to the monitoring of the marine<br />

environment, ocean acoustic tomography and geoacoustic inversions, acoustic observables<br />

and inversion techniques, instrumentation for ocean acoustic observatories, stationary vs.<br />

mobile observatories, deep-water vs. shallow-water issues, ongoing experiments and IPs. In<br />

their partner-level reporting for <strong>Period</strong> 3, several Partners indicated several progress areas that<br />

fall mostly outside of the DM activities and are only partially captured in D11 and or D13,<br />

including NGI, HCMR, FORTH, ULB, CNRS, NOCS, ITU, NERSC, and DEU-IMST.<br />

NGI deployed an autonomous piezometer system at a gas industry site with a water depth of<br />

1300 m. The monitoring system collects data at 18, 20, and 65 m below the seabed and 4<br />

months of data have already been recovered.<br />

CNRS/LOV developed and tested an underwater vision profiler to quantify marine particles<br />

including sedimentation and resuspension rates with a 3000 m depth rating, which can easily<br />

be modified.<br />

Del.<br />

no.<br />

D11-<br />

2010<br />

D13-<br />

2010<br />

2.3.3 Deviations from the project work programme, and corrective actions taken<br />

2.3.4 Deliverables list<br />

Deliverable name WP no. Date<br />

due<br />

<strong>Report</strong> on scientific<br />

background and<br />

objectives<br />

<strong>Report</strong> on science<br />

modules<br />

* if available<br />

2.3.5 Milestones list<br />

Actual/Forecasted<br />

delivery date<br />

Estimated<br />

indicative<br />

personmonths<br />

(*)<br />

Used<br />

indicative<br />

personmonths<br />

(*)<br />

Lead<br />

contractor<br />

WP3 33 33 NOCS<br />

WP3 33 33 NOCS<br />

Mil. no. Milestone name<br />

Work package<br />

no.<br />

Date due<br />

Actual/Forecasted<br />

delivery date<br />

Lead<br />

contractor<br />

3.a. Update WP3 M33 NOCS<br />

3.b. Update WP3 M33 NOCS<br />

3.c. Update WP3 M33 NOCS<br />

April 2010 36