ESONET Contract no.036851/<strong><strong>Period</strong>ic</strong> <strong>Activity</strong> <strong>Report</strong>/3 rd <strong>Period</strong><br />
were approved, with the indication from the Steering Committee that two of them be merged<br />
as they both concentrated on the Artic node.<br />
According to the same document structure set up during the 1 st Call, the implementation<br />
plans, i.e. the reference documents for each DM development, were collected for the new<br />
DMs, AOEM and MODOO, in Spring 2009. The process of signing the Grant Agreements,<br />
which constitutes the formal framework for the development of the DMs, was thus started.<br />
An updated summary of the DMs approved by the ESONET Steering Committee is given in<br />
Table 4.1 and Fig. 4.1.<br />
Table 4.1 Demonstration missions approved by ESONET<br />
DM Name Coordinator Start Date End Date Duration<br />
DM progress<br />
(months since<br />
(months) start)<br />
DMs approved in the 1 st Call<br />
LIDO<br />
LOOME<br />
MARMARA-<br />
DM<br />
MOMAR-D<br />
Universitat Politecnica<br />
de Catalunya (E)<br />
Michel André<br />
Max Planck Institute<br />
MM (D)<br />
Dirk de Beer<br />
IFREMER (F)<br />
Louis Geli<br />
IFREMER (F)<br />
Pierre-Marie Sarradin<br />
DMs approved in the 2 nd Call<br />
AOEM<br />
MODOO<br />
National Oceanographic<br />
Centre<br />
Southampton (UK)<br />
Ian Wright<br />
IFM-GEOMAR (D)<br />
Johannes Karstensen<br />
01.09.2008 31.08.2010 24 9<br />
01.02.2008 31.12.2010 35 16<br />
01.04.2008 30.09.2010 30 14<br />
01.09.2008 31.08.2010 24 9<br />
01.07.09 31.10.2010 16 To be started<br />
01.05.09 30.09.2010 17 1<br />
April 2010 38