Cheakamus River Water License Requirements ... - BC Hydro
Cheakamus River Water License Requirements ... - BC Hydro
Cheakamus River Water License Requirements ... - BC Hydro
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Cheakamus</strong> <strong>River</strong> Benthic Community Monitoring, Progress Report 5<br />
March, 2009. Spring and fall samples will be collected later in 2009. The resulting data<br />
will be appended to existing physical, chemical, and biological data from 1996, 2000,<br />
and 2005. All data is being compiled into an Access database for storage and retrieval<br />
as needed. The final statistical analyses and modeling will be completed in 2010.<br />
Limnotek/InStream<br />
November 2009