The concept provides 32,000 m 2 of open complexed cold water side channel. Note that this<br />

option may impact some wildlife habitat associated with the current wetted area. The concept<br />

costs for 17.2L are $0.82M.<br />

7.4 <strong>River</strong> Km 23.0L<br />

The site at <strong>River</strong> KM 23.0L located just upstream of Farrell Creek, consists of an extensively<br />

infilled, 0.6 km long left bank side channel. The proposed site is shown on Map sheet 4 of 11,<br />

with oblique aerial imagery compiled on Plate 4.4.1. A small residual wetted area was observed<br />

at the channel outlet in May 2009. The upstream channel was found to be dry and no water<br />

was being diverted into this area. The side channel presently has no value to fish due to a lack<br />

of water. <strong>Restoration</strong> of the channel would provide additional habitat for the cold water fish<br />

assemblage that occurs in the area, with limited benefits incurred by younger life stages (i.e.<br />

fry) that originate from Farrell Creek.<br />

Site 23.0L is readily accessed from Highway 28 and the adjacent farm, and approximately 140 m<br />

of access road is required to the site. The rationale for this site is the conversion of a dry closed<br />

relic channel into a closed wetted side channel providing off channel rearing and refuge habitat.<br />

The proposed work at the site includes:<br />

1. Excavate 27,000 m 3 of sediment and fill the existing upstream bar forming a closed side<br />

channel 1‐2 m deep, 15‐25 m wide; and<br />

2. Large wood complexing of the new channel at 4‐8 sites along the channel with 25‐40 m 2<br />

jams.<br />

Excavation of a deepened pool at the exit or head of the channel may provide refuge habitat<br />

and improve subsurface flow into the channel. The total restored closed channel area provides<br />

19,000 m 2 of habitat for cold‐clear water fish assemblage. The total estimated conceptual costs<br />

for this option at 23.0L are $0.51M.<br />

7.5 <strong>River</strong> KM 32.0L<br />

Site 32.0L consists of a 2.4 km long left bank side channel located between an island and the<br />

base of the left bank valley wall. Plans for this site are presented on Map sheet 5 of 11. Oblique<br />

imagery is compiled on Plate 4.5.1.<br />

This side channel contained a wetted channel open at the downstream end, and a series of<br />

large wetland or ponds in May 2009. The satellite imagery, however, indicates that the wetted<br />

channel becomes discontinuous at low flow. Ground photos, shown on Plate 4.5.2, illustrate<br />

how post‐regulation sediment deposition and vegetation growth has infilled the former side<br />

channel area. This side channel represents habitat that can be utilized by unique fish<br />

assemblages. This side channel is open only at the lower end, the lowermost portion contains<br />

deep water that can support fish year round, and there is an abundance of emergent<br />

<strong>Peace</strong> <strong>River</strong> <strong>Side</strong> <strong>Channel</strong> <strong>Restoration</strong> 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!