CERAMIC CAP<br />

CERAMIC COVER<br />

NUT<br />

LOCK WASHER<br />

FLAT WASHER<br />

RING TERMINAL<br />

TERMINAL STUD<br />

FIGURE 2-2<br />

REX TCS HEATER TERMINAL CONNECTION VIEW<br />

Check before wiring!<br />

Note the voltage printed on each heater half and also specified on the BOM<br />

document. Heaters are rated in halves and must be wired in series when line<br />

voltage is higher than the marked heater voltage. See figure 2-2 prior to<br />

making electrical connections.<br />

Care required! Electrical connections require 26in-lb tightness. Use 3/8 a wrench<br />

to hold the terminal in place while tightening the nut to prevent potential damage<br />

due to twisting the terminal.<br />

3. Heaters within the same zone are controlled by the same temperature<br />

controller. Verify that the voltage supplied to each heater is in accordance with<br />

the voltage marked on the heater. Refer to customer temperature controller<br />

literature for controller wiring.<br />