CERAMIC CAP<br />
CERAMIC COVER<br />
NUT<br />
LOCK WASHER<br />
FLAT WASHER<br />
RING TERMINAL<br />
TERMINAL STUD<br />
FIGURE 2-2<br />
REX TCS HEATER TERMINAL CONNECTION VIEW<br />
Check before wiring!<br />
Note the voltage printed on each heater half and also specified on the BOM<br />
document. Heaters are rated in halves and must be wired in series when line<br />
voltage is higher than the marked heater voltage. See figure 2-2 prior to<br />
making electrical connections.<br />
Care required! Electrical connections require 26in-lb tightness. Use 3/8 a wrench<br />
to hold the terminal in place while tightening the nut to prevent potential damage<br />
due to twisting the terminal.<br />
3. Heaters within the same zone are controlled by the same temperature<br />
controller. Verify that the voltage supplied to each heater is in accordance with<br />
the voltage marked on the heater. Refer to customer temperature controller<br />
literature for controller wiring.<br />
23