Operation<br />

Overview<br />

Before applying power to your new <strong>Rex</strong> TCS System, it is important to verify that all<br />

assembly and wiring procedures have been properly performed. Then we will review the normal<br />

operation of the <strong>Rex</strong> TCS System and discuss how to monitor its performance.<br />

<strong>Rex</strong> TCS Pre-Start Inspection and Checklist<br />

Prior to switching on the power to your <strong>Rex</strong> TCS System, please review the following checklist<br />

to assure that all components have been installed in accordance with Section Two of this manual.<br />

Please verify the following:<br />

□ All <strong>Rex</strong> TCS Heaters are tight on the barrel with no gaps between heaters<br />

□ Double check that the power supply voltage to each heater is per its design<br />

□ Check that barrel is properly grounded. See page 12.<br />

□ Lead wires are in good condition and securely fastened at all connections<br />

□ All heaters in a given zone are controlled by the same temperature controller<br />

□ All temperature controllers are functioning correctly<br />

□ All thermocouples and sensors are mounted and adjusted to seat properly<br />

□ All Teflon Zone Covers are installed and secured with o-rings<br />

□ All wires are neatly routed, secure, and protected<br />