02.02.2013 Views

Fiesta Playhouse Hardware List

Fiesta Playhouse Hardware List

Fiesta Playhouse Hardware List

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Step 5<br />

589<br />

224<br />

587<br />

18 1/8"<br />

224<br />

553<br />

224 520 H194<br />

H1 H108<br />

520 H194<br />

231<br />

2 HOLE FACIA REMOVED<br />

FROM VIEW FOR CLARITY<br />

588<br />

Rail Installation<br />

*NOTE: All Railing installations should fit snug with no or minimal space in between each<br />

Boards (519) (520).<br />

*NOTE: Ensure pre-drilled screw holes hit the flat surface of the facias they attach to.<br />

1. Measure up 18 1/8" on Corner Uprights (553) and attach Left Counter Support (587) and Right<br />

Counter Support (588) using 1/4" <strong>Hardware</strong> (H1) and 5/16" <strong>Hardware</strong> (H108).<br />

2. Position Corner Facias (559) and 2 Hole Facias (591) (in locations shown) and attach to Corner<br />

Uprights (553) using 1/4" <strong>Hardware</strong> (H1) and 5/16" <strong>Hardware</strong> (H108).<br />

3. Attach Rail Uprights (520) (in locations shown) to 2 Hole Facias (224) and Arched Facia (589)<br />

using #8 <strong>Hardware</strong> (H194).<br />

4. Position Full Rail Uprights (519) (in locations shown) and attach to Corner Facias (559) and 2 Hole<br />

Facias (591) using #8 <strong>Hardware</strong> (H194). When properly installed, the door opening should<br />

measure approximately 19 1/2" (as shown).<br />

519<br />

559<br />

19<br />

H194<br />

591<br />

19 1/2"<br />

H1<br />

519<br />

553<br />

590<br />

H1<br />

559<br />

H108<br />

H108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!