Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3 aSSEMBLy<br />
30<br />
<strong>aquatherm</strong> <strong>ISO</strong>-socket<br />
3. Marking of shrink sleeve position<br />
3.1 For determination of the same overlap on both sides of<br />
the casing pipes, the shrink sleeve must be pushed to one<br />
end of the casing pipe. Then the end of the shrink sleeve is<br />
marked on the other side of the casing pipe.<br />
3.2 Push back the shrink sleeve so far in direction of the<br />
starting position that the marking of step 3.1 becomes visible.<br />
Meter the distance between marking and leading edge<br />
of the casing pipe and mark center distance.<br />
3.3 Pass the dimension of center distance on the casing<br />
pipe on the opposite side and mark it also.<br />
3.1<br />
Marking of the shrink sleeve position<br />
3.2<br />
Marking of the shrink sleeve position<br />
3.3<br />
Marking of the shrink sleeve position