23.10.2016 Views

Kas Tālāk Aukstas Kodolsintēzes? .. Super Efektīvs Strāvas Ģeneratori Sacenšas par Cilveku Uzmanība(Kopsavilkumu Latviešu) / What's Next Cold Fusion? Fundamental Paradigm Shift in Energy Cleantech with Scientific, Economical & political impact

Kas Tālāk Aukstas Kodolsintēzes? .. Super Efektīvs Strāvas Ģeneratori Sacenšas par Cilveku Uzmanība(Kopsavilkumu Latviešu) / What's Next Cold Fusion? Fundamental Paradigm Shift in Energy Cleantech with Scientific, Economical & political impact

Kas Tālāk Aukstas Kodolsintēzes? .. Super Efektīvs Strāvas Ģeneratori Sacenšas par Cilveku Uzmanība(Kopsavilkumu Latviešu) / What's Next Cold Fusion? Fundamental Paradigm Shift in Energy Cleantech with Scientific, Economical & political impact

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Lowest Cost <strong>Energy</strong> As Vast Biomass -3, Residual &<br />

• -->cont: •1FOREST RELATED:<br />

1b Industrial extra wood fibre recovery: There is extensive recovery of forest<br />

by th<strong>in</strong>n<strong>in</strong>g plantation as well as harvest<strong>in</strong>g entire tree(<strong>in</strong>clud<strong>in</strong>g branches), and<br />

sometimes stump & root: F<strong>in</strong>land harvests more than 1 million m3/yr <strong>in</strong> recent<br />

years, some synergy <strong>with</strong> peat harvest<strong>in</strong>g, <strong>in</strong>crease m<strong>in</strong>imum 10% of wood vol,<br />

much less extent but still done <strong>in</strong> Sweden, Baltics, UK. Also general above<br />

ground wood debris recovery from forest is lot higher <strong>in</strong> North West Europe than<br />

most other regions. Infra set up <strong>with</strong> first certa<strong>in</strong> duration of "<strong>in</strong>vestment<br />

period" is needed.<br />

• 1c Wood Gasification & Power generation: Net energy ga<strong>in</strong> com<strong>par</strong>ed to<br />

simple combustion, cost itself had been higher than conventional combustion <strong>in</strong><br />

the past due to technical & uptime issue but situation is rapidly chang<strong>in</strong>g <strong>in</strong> last<br />

2-3yrs. Some are CHP(Comb<strong>in</strong>ed Heat & Power)/Cogeneration.<br />

• ◆1 LARGE SIZE power plant application(~10-150MWh~) by overcom<strong>in</strong>g tar,<br />

corrosion, plugg<strong>in</strong>g issue etc, predom<strong>in</strong>antly North West Euro companies, due to<br />

the size primarily Fix Bed Updraft, or Entra<strong>in</strong>ment, Circular or Bubbl<strong>in</strong>g Fluidized<br />

Bed(Foster Wheeler - VTT, Vølund, <strong>Next</strong>erra, Valmet, Andritz Carbona, Outotec,<br />

Metso+), Cleaner emission by Steam Fluidized Bed◎(Repotec GmbH, Bosio si),<br />

101<br />

l<strong>in</strong>ked<strong>in</strong>.com/<strong>in</strong>/newnature<strong>par</strong>adigm -Ben Rusuisiak: Specialty <strong>Cleantech</strong> Analysis, Vancouver, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!