Visual inspection (authorized expert)<br />

Inspection report<br />

On a regular/extraordinary inspection/re-inspection*.<br />

The device was subjected to an inspection for operational readiness. No/the following* defects were found:<br />

Scope of inspection: Functional and visual inspection according to specifications<br />

Partial inspection still outstanding:<br />

There are no *) objections to commissioning, subsequent testing is not *) required.<br />

(place, date)<br />

Confirmation of acceptance:<br />

(Signature of expert)<br />

(Name of expert)<br />

(Job title)<br />

(Address)<br />

(Employed by)<br />

Operator (Company stamp, date, signature)<br />

Defects noted **)<br />

Deficiencies corrected **)<br />

*) Please delete where not applicable<br />

**) Confirmation of the operator or an authorized representative with date and signature<br />

160<br />

® Copyright <strong>ATH</strong>-<strong>Heinl</strong> GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved<br />

Release date: 26.01.2024 / Product manufacturer <strong>ATH</strong>-<strong>Heinl</strong> GmbH & Co. KG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!