1 - Hjallerup Maskinforretning A/S
1 - Hjallerup Maskinforretning A/S
1 - Hjallerup Maskinforretning A/S
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ENGLISH (115-501)<br />
CONNECTION / DISCONNECTION<br />
Make sure, when disconnecting implements,<br />
that the bucket rams NOT are in end<br />
position (disconnection under pressure may<br />
cause problems when connecting).<br />
F<br />
Fig. F<br />
Connection<br />
- Clean the surfaces carefully of loader-and implement<br />
parts.<br />
- Fit the dowels of the implement part into corresponding<br />
holes on the loader part (A).<br />
- Make sure that the lever grips the implement part (B)<br />
and move lever backwards until the lever is secured.<br />
- Always when connecting check that the lever is<br />
locked.<br />
Disconnection<br />
- Push button C and move lever forwards.<br />
- Remove the implement part and hitch on to the<br />
implement.<br />
Move the lever to locked position for protection<br />
( IMPORTANT).<br />
SPECIFICATIONS<br />
Dimension of quick couplings: 3/8"<br />
Oil pressure: max. 200 bar (the total pressure on all<br />
couplings (2 or 4).<br />
MAINTENANCE<br />
Always when connecting, clean the surfaces of the<br />
loader - and implement parts carefully.<br />
Oil leakage<br />
The quick couplings may get damaged, either due to<br />
impurities ( not cleaned surfaces before connection) or<br />
due to an exceeding of the max. allowed oil pressure<br />
(200 bar). If this is the case, locate the leaking line and<br />
exchange the damaged coupling - see the spare parts<br />
sheet.<br />
ATTENTION<br />
Faulty use or maintenance of products aimed for high oil<br />
pressures may cause serious damages. It is therefore of<br />
the utmost importance that the instructions are followed<br />
and that damaged or worn out parts are immediately<br />
exchanged.<br />
115