BMP Broschüre 04.2017

BMP Unternehmensbroschüre 04.2017 Seit 20 Jahren gemeinsam vorne.

BMP Unternehmensbroschüre 04.2017
Seit 20 Jahren gemeinsam vorne.

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

Architects<br />

Fire<br />

protection<br />

expert<br />

Client<br />

<strong>BMP</strong><br />

Technical<br />

building<br />

equipment<br />

controlling<br />

Project controlling<br />

Specialist<br />

planner for<br />

technical building<br />

equipment<br />

User<br />

Structural<br />

engineer<br />

Working more smartly due to in-house<br />

controlling of technical building equipment<br />

Since 2015, we have been offering the<br />

controlling of technical building equipment as<br />

an in-house <strong>BMP</strong> service in order to support the<br />

project management team.<br />

The architecture and the usage quality of a<br />

building significantly rely on the technical<br />

building equipment - depending on the type<br />

of building the technical building equipment<br />

can easily make up 60 percent of the total<br />

construction costs. Our technical building<br />

equipment controlling team checks the services<br />

of all partners involved in planning to ensure<br />

that they are coordinated appropriately.<br />

Another task is to check for compliance with<br />

the applicable standards and regulations. It’s<br />

our job to advise, to accompany and to control<br />

– starting with the early stages of planning to<br />

the installation of the technical components,<br />

commissioning and up to continuous operation<br />

following acceptance. We are contact partners<br />

for planners, technicians and facility managers.<br />

Planning quality control and construction<br />

management are the main tasks of our<br />

technical building equipment controlling<br />

team. Each building project is being planned<br />

in an interdisciplinary team, independently<br />

whether we are dealing with a new building<br />

or the restoration of an existing one. In most<br />

cases, the work phases are governed by<br />

HOAI (German fee structure for architects<br />

and engineers), but often our customers have<br />

their own specifications and demands. After<br />

having completed a work phase, it needs to<br />

be confirmed whether the services have been<br />

carried out to the extent and in the quality<br />

agreed. The compliance with the specific<br />

project parameters regarding technical building<br />

equipment (costs, energy efficiency and<br />

certification) is regularly checked throughout<br />

the planning process. Here we also monitor<br />

whether the agreed project parameters<br />

regarding technical building equipment will<br />

be reached. An optimum planning quality<br />

and the implementation of necessary rework<br />

are the central tasks.<br />

The evaluation of building substance is<br />

another task. The economic validity of the<br />

redevelopment is the decisive question when it<br />

comes to existing buildings. We give advice to<br />

planners and investors regarding the condition<br />

and the sustainability of existing technical<br />

facilities.<br />

Construction firms increasingly award the<br />

complete planning to a main planner ant the<br />

building services to a general contractor,<br />

for turnkey delivery. Therefore we, as<br />

<strong>BMP</strong>, increasingly prepare the functional<br />

specifications and monitor the general<br />

contractor’s services. Ideally, there are<br />

only three main players in the project: the<br />

main planner, the general contractor and the<br />

project manager. Thus, interfaces and inherent<br />

problems and risks can be reduced significantly.<br />

For large-scale projects the commissioningmanagement<br />

becomes more and more<br />

important. As the facilities become increasingly<br />

complex and have manifold links to the higher<br />

level building automation and alarm detection<br />

systems, commissioning requires special<br />

attention and care. We are familiar with the<br />

difficult workflows in the technical building<br />

services and we are aware of the complex and<br />

time-consuming testing and adjustment work.<br />

Therefore, we ensure optimum arrangement<br />

and functionality by setting up realistic work<br />

schedules, monitoring the commissioning,<br />

and documenting the results. Commissioning<br />

planning already starts at an early stage of<br />

planning.<br />

In-house controlling for the technical building<br />

equipment means lean management structures<br />

and best possible integration, availability and<br />

reliability of the equipment. Our staff comprises<br />

of a mix of senior and junior engineers,<br />

which provides a good mix of experience and<br />

advanced knowledge. We have decades of<br />

experience in planning and realising small-scale<br />

and large-scale projects.<br />

By the way: SMART means to us not just<br />

effective, but individual, intelligent, innovative<br />

and focussed on the team and the result.<br />