12.02.2013 Aufrufe

Big stage set against Alpine panorama - TW TagungsWirtschaft

Big stage set against Alpine panorama - TW TagungsWirtschaft

Big stage set against Alpine panorama - TW TagungsWirtschaft

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

Kongress Palais Kassel<br />

The colonnade annex with<br />

1,900 square meters of<br />

technology and event-staging<br />

space on the top floor and<br />

sixfold partitionable 1,000<br />

sqms of space on the ground<br />

floor raise the center’s capacity<br />

to approximately 8,000<br />

square meters. This corresponds<br />

to an increase in capacity<br />

by 60 per cent. Management<br />

is convinced that<br />

this size and flexibility is what<br />

it takes to be geared for future<br />

operations.<br />

Kassel’s lord mayor Bertram<br />

Hilgen is convinced that expansion<br />

of the Kongress Palais<br />

both in terms of size and<br />

function considerably increases<br />

the city’s quality and<br />

attractiveness as convention<br />

and congress venue. He’s delighted<br />

that the harmonious<br />

annex is yet another architectural<br />

landmark in Kassel, a city<br />

renowned as center of culture<br />

and art.<br />

City treasurer Dr. Jürgen Barthel,<br />

at the same time also<br />

chairman of the supervisory<br />

board of Kassel Marketing<br />

und Tagungszentrum Stadthalle<br />

Kassel (TSK), considers<br />

the city’s central location in<br />

Germany, the good traffic infrastructure<br />

as well as the<br />

outstanding price/benefit ratio<br />

to be major as<strong>set</strong>s and<br />

guarantors of success for the<br />

new colonnades annex.<br />

The first major event to be<br />

<strong>stage</strong>d here in late August of<br />

this year will be the Solar<br />

World Congress. “The colonnade<br />

annex is a major milestone<br />

for the Kongress Palais’s<br />

sustainability. It was a<br />

great challenge on all involved<br />

parties to build and<br />

ready the annex on schedule<br />

in a very short period of time.<br />

Winter came early last year,<br />

and that required a lot of extra<br />

work to keep the schedule.<br />

On top of all that, there were a<br />

number of huge boulders that<br />

had to be cleared from the<br />

grounds, and they weighed<br />

up to 42 tons,“ said Peter Ley,<br />

general manager of GWG and<br />

TSK, which is in charge of<br />

building management.<br />

“We arrived at the decision to<br />

build the annex to the Kongress<br />

Palais also on the basis<br />

of experiences made in other<br />

cities. Only event venues<br />

meeting minimum size requirements<br />

will have a fair<br />

chance in this competitive<br />

market,“ said Angelika<br />

Hüppe, deputy director of<br />

Kassel Marketing. The annex<br />

will meet the needs of established<br />

clientele organizing<br />

major events.<br />

This clientele also includes<br />

the organizers Animexx and<br />

Inline. “In addition, we have<br />

more than 100 events on<br />

hold, and our expanded capacity<br />

will enable us to work<br />

off that backlog as well,“ said<br />

Hüppe. Management ex-<br />

4/2011 39<br />

pects to double sales now<br />

that the annex is in operation.<br />

The Kongress Palais now has<br />

capacities in terms of space,<br />

equipment, and services<br />

meeting the rising demands<br />

and needs of event organizers.<br />

The expansion design is<br />

based upon the winning entry<br />

of an architectural competi-<br />

GERMANY<br />

Milestone for sustainability<br />

Increased<br />

attractiveness<br />

Capacities of the historic, almost 100-year-old Kongress<br />

Palais Kassel have finally been expanded; the new colon-<br />

nades annex built in the course of one year was officially<br />

inaugurated on Tuesday, August 16, 2011.<br />

tion <strong>stage</strong>d in 2009. The responsible<br />

architect Prof.<br />

Alexander Reichel pointed<br />

out that his draft design of the<br />

building was characterized by<br />

the adaptation of function to<br />

the topographical situation at<br />

the building site, which led to<br />

an exciting togetherness of<br />

old and new construction<br />

forms. KA

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!