20.02.2013 Views

Government of Canada Workplace 2.0 Fit-up Standards

Government of Canada Workplace 2.0 Fit-up Standards

Government of Canada Workplace 2.0 Fit-up Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Government</strong> <strong>of</strong> <strong>Canada</strong> <strong>Workplace</strong> <strong>2.0</strong> <strong>Fit</strong>-<strong>up</strong> <strong>Standards</strong> Section A: General-purpose Office Space<br />

Existing OI<br />

New OI<br />

Reimbursing and Expansion Control Framework (ECF) Occ<strong>up</strong>ancy Instruments (OIs)<br />

Inventory Impact Project Description<br />

During Term <strong>of</strong><br />

Occ<strong>up</strong>ancy<br />

Same Location:<br />

OI Renewal or<br />

OI & Lease<br />

Renewal (with<br />

or without a<br />

space<br />

reduction)<br />

New Location:<br />

Expansion or<br />

Replacement<br />

Tenant Services: Alterations<br />

to Existing Accommodation<br />

Cyclical Maintenance:<br />

Repair or Replacement<br />

Tenant Services: Alterations<br />

to Existing Accommodation<br />

Cyclical Maintenance:<br />

Repair or Replacement<br />

<strong>Fit</strong>-<strong>up</strong> for Initial Occ<strong>up</strong>ancy or<br />

<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Existing Space for<br />

Reuse<br />

<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Swing Space for<br />

Initial Occ<strong>up</strong>ancy or for Reuse<br />

Major<br />

Renovations by<br />

PWGSC <strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Long Term Space for<br />

Reuse (i.e. move back to<br />

original location)<br />

Major<br />

Renovations by<br />

PWGSC & Client<br />

Department<br />

<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Swing Space for<br />

Initial Occ<strong>up</strong>ancy or for Reuse<br />

<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Long Term Space for<br />

Reuse (i.e. move back to<br />

original location)<br />

<strong>Fit</strong>-<strong>up</strong> Components<br />

(see <strong>Fit</strong>-<strong>up</strong> <strong>Standards</strong><br />

A3.3)<br />

A-25<br />

April 2012<br />

Base Building<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Funding<br />

Department<br />

Mechanism for<br />

Obtaining<br />

Funding*<br />

Client SSA<br />

Base Building PWGSC FAH (BMP/WPM ) 1,2<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Base Building<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Client SSA<br />

Client SSA<br />

Base Building PWGSC FAH (BMP/WPM) 1,2<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Client SSA<br />

Base Building PWGSC FAH (BMP/WPM) 2<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Base Building<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Client SSA<br />

PWGSC FAH (BMP/WPM) 2<br />

Base Building PWGSC FAH (BMP/WPM) 2<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Client SSA<br />

Base Building PWGSC FAH (BMP/WPM) 2<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

PWGSC/Client<br />

FAH (BMP/WPM) or<br />

SSA 3<br />

Base Building PWGSC FAH (BMP/WPM) 2<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Space Expansion Avoidance: Base Building<br />

Alterations to Existing<br />

Accommodation to Increase<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Space<br />

FTEs Other<br />

Optimization Densification:<br />

Base Building<br />

Alterations to Existing<br />

Accommodation to Reduce<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

m²/FTE Other<br />

Forced Move by<br />

PWGSC<br />

<strong>Fit</strong>-<strong>up</strong> for Initial Occ<strong>up</strong>ancy or<br />

<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Existing Space for<br />

Reuse<br />

Base Building<br />

Standard <strong>Fit</strong>-<strong>up</strong><br />

Other<br />

Client SSA<br />

Client SSA<br />

Client SSA<br />

PWGSC FAH (BMP/WPM) 2,4<br />

1<br />

PWGSC assumes the costs for moving <strong>of</strong> screens and standard furniture, as required to implement cyclical<br />

maintenance (e.g. for carpet replacement). Client department pays for dismantling, moving and reassembling <strong>of</strong><br />

computers, telecommunications and other specialized equipment and furnishings, as required and when provided with<br />

sufficient notification to program the required funds.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!