Government of Canada Workplace 2.0 Fit-up Standards
Government of Canada Workplace 2.0 Fit-up Standards
Government of Canada Workplace 2.0 Fit-up Standards
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Government</strong> <strong>of</strong> <strong>Canada</strong> <strong>Workplace</strong> <strong>2.0</strong> <strong>Fit</strong>-<strong>up</strong> <strong>Standards</strong> Section A: General-purpose Office Space<br />
Existing OI<br />
New OI<br />
Reimbursing and Expansion Control Framework (ECF) Occ<strong>up</strong>ancy Instruments (OIs)<br />
Inventory Impact Project Description<br />
During Term <strong>of</strong><br />
Occ<strong>up</strong>ancy<br />
Same Location:<br />
OI Renewal or<br />
OI & Lease<br />
Renewal (with<br />
or without a<br />
space<br />
reduction)<br />
New Location:<br />
Expansion or<br />
Replacement<br />
Tenant Services: Alterations<br />
to Existing Accommodation<br />
Cyclical Maintenance:<br />
Repair or Replacement<br />
Tenant Services: Alterations<br />
to Existing Accommodation<br />
Cyclical Maintenance:<br />
Repair or Replacement<br />
<strong>Fit</strong>-<strong>up</strong> for Initial Occ<strong>up</strong>ancy or<br />
<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Existing Space for<br />
Reuse<br />
<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Swing Space for<br />
Initial Occ<strong>up</strong>ancy or for Reuse<br />
Major<br />
Renovations by<br />
PWGSC <strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Long Term Space for<br />
Reuse (i.e. move back to<br />
original location)<br />
Major<br />
Renovations by<br />
PWGSC & Client<br />
Department<br />
<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Swing Space for<br />
Initial Occ<strong>up</strong>ancy or for Reuse<br />
<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Long Term Space for<br />
Reuse (i.e. move back to<br />
original location)<br />
<strong>Fit</strong>-<strong>up</strong> Components<br />
(see <strong>Fit</strong>-<strong>up</strong> <strong>Standards</strong><br />
A3.3)<br />
A-25<br />
April 2012<br />
Base Building<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Funding<br />
Department<br />
Mechanism for<br />
Obtaining<br />
Funding*<br />
Client SSA<br />
Base Building PWGSC FAH (BMP/WPM ) 1,2<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Base Building<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Client SSA<br />
Client SSA<br />
Base Building PWGSC FAH (BMP/WPM) 1,2<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Client SSA<br />
Base Building PWGSC FAH (BMP/WPM) 2<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Base Building<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Client SSA<br />
PWGSC FAH (BMP/WPM) 2<br />
Base Building PWGSC FAH (BMP/WPM) 2<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Client SSA<br />
Base Building PWGSC FAH (BMP/WPM) 2<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
PWGSC/Client<br />
FAH (BMP/WPM) or<br />
SSA 3<br />
Base Building PWGSC FAH (BMP/WPM) 2<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Space Expansion Avoidance: Base Building<br />
Alterations to Existing<br />
Accommodation to Increase<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Space<br />
FTEs Other<br />
Optimization Densification:<br />
Base Building<br />
Alterations to Existing<br />
Accommodation to Reduce<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
m²/FTE Other<br />
Forced Move by<br />
PWGSC<br />
<strong>Fit</strong>-<strong>up</strong> for Initial Occ<strong>up</strong>ancy or<br />
<strong>Fit</strong>-<strong>up</strong> <strong>of</strong> Existing Space for<br />
Reuse<br />
Base Building<br />
Standard <strong>Fit</strong>-<strong>up</strong><br />
Other<br />
Client SSA<br />
Client SSA<br />
Client SSA<br />
PWGSC FAH (BMP/WPM) 2,4<br />
1<br />
PWGSC assumes the costs for moving <strong>of</strong> screens and standard furniture, as required to implement cyclical<br />
maintenance (e.g. for carpet replacement). Client department pays for dismantling, moving and reassembling <strong>of</strong><br />
computers, telecommunications and other specialized equipment and furnishings, as required and when provided with<br />
sufficient notification to program the required funds.