20.02.2013 Views

Uni Wide - Layher

Uni Wide - Layher

Uni Wide - Layher

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

12<br />

Assembly <strong>Layher</strong> <strong>Uni</strong> <strong>Wide</strong> Tower<br />

�9 Operating the castors<br />

1<br />

Fix wing<br />

screw<br />

�10 Maximum spindle adjustment of the various models<br />

max.<br />

40 cm<br />

max.<br />

60 cm<br />

During assembly and while working, the castors 1<br />

must be kept locked by pressing down the brake lever<br />

labelled STOP. When the brake is locked, the lever<br />

labelled STOP is in the down position.<br />

For movement, the castors 1 are unlocked by pushing<br />

the other lever down.<br />

Construction directly on castors with access ledger Construction directly on castors<br />

max. 15 cm<br />

Models: 2102 – 2105<br />

2126 – 2131<br />

2146 – 2151<br />

Assembly with 1323.320<br />

max. 15 cm<br />

Models: 2106 – 2111<br />

Models: 2202 – 2205<br />

max.<br />

40 cm<br />

max. 30 cm<br />

0 cm<br />

Models: 2101; 2201<br />

max. 60 cm<br />

max.<br />

40 cm<br />

max. 30 cm<br />

Models: 2206 – 2211<br />

2306 – 2311

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!