Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
12<br />
Assembly <strong>Layher</strong> <strong>Uni</strong> <strong>Wide</strong> Tower<br />
�9 Operating the castors<br />
1<br />
Fix wing<br />
screw<br />
�10 Maximum spindle adjustment of the various models<br />
max.<br />
40 cm<br />
max.<br />
60 cm<br />
During assembly and while working, the castors 1<br />
must be kept locked by pressing down the brake lever<br />
labelled STOP. When the brake is locked, the lever<br />
labelled STOP is in the down position.<br />
For movement, the castors 1 are unlocked by pushing<br />
the other lever down.<br />
Construction directly on castors with access ledger Construction directly on castors<br />
max. 15 cm<br />
Models: 2102 – 2105<br />
2126 – 2131<br />
2146 – 2151<br />
Assembly with 1323.320<br />
max. 15 cm<br />
Models: 2106 – 2111<br />
Models: 2202 – 2205<br />
max.<br />
40 cm<br />
max. 30 cm<br />
0 cm<br />
Models: 2101; 2201<br />
max. 60 cm<br />
max.<br />
40 cm<br />
max. 30 cm<br />
Models: 2206 – 2211<br />
2306 – 2311