25.02.2013 Views

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

DOE-2 Engineers Manual Version 2.1A - DOE-2.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.3<br />

TABLE OF CONTENTS (Cont.)<br />

Page<br />

2.2.8 Load Allocation Routines. • • • • • • • • • V.92<br />

2.2.8.1<br />

2.2.8.2<br />

User Defined Equipment Operation.<br />

2.2.8.1.1 LOAD-ASSIGr-t1ENT<br />

(subroutine EQUIP) ••<br />

2.2.8.1.2 LOAD-MANAGEMENT<br />

(subroutine EQPTRS).<br />

Default Equi pment Operation ••<br />

2.2.8.2.1 Optimum Distribution of<br />

Cooling Load to Mul ti-<br />

generic Types (routines<br />

V.98<br />

V.98<br />

V.102<br />

V.103<br />

OPCOOL and OPCOLD) • • • V.103<br />

2.2.8.2.2 Optimum Distribution of<br />

Electrical Load (routines<br />

OPELEC and OPFUEL) • • •• V.l14<br />

2.2.8.2.3 Allocation to the Different<br />

Sizes of an Equipment Type<br />

(routine LDIST). • • • •• V.l18<br />

Economic Calculations •••• V.121<br />

2.3.1 Equipment Costs (subroutines COSTEQ and DEFALT). V.126<br />

2.3.2 Function CYC<br />

2.3.3 Energy Costs (subroutine COSTEN)<br />

V.130<br />

V.132<br />

3. SOLAR SIMULATffi (CBS). • ••••••<br />

V.136<br />

3.1 Introduction.... • •••• •• V.136<br />

3.1.1 Relation of CBS to LOADS, SYSTEMS, and PLANT/<br />

Equipment Sizing.<br />

V.136<br />

3.1. 2 Space Heating ••••••••<br />

V.l3?<br />

3.1. 3 Hot Water and Solar Cool ing.<br />

V.138<br />

3.1.4 H eat Pumps •••••••••<br />

V.139

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!